Shipping Inspection

All units are securely packed in shipping containers 

tested according to International Safe Transit Association 

specifications. The carton must be checked upon arrival 

for external damage. If damage is found, a request for 

inspection by carrier’s agent must be made in writing 

immediately.

The furnace must be carefully inspected on arrival for 

damage and bolts or screws which may have come loose 

in transit. In the event of damage the consignee should:

1.  Make a notation on delivery receipt of any visible 

damage to shipment or container.

2.  Notify carrier promptly and request an inspection.

3. 

With concealed damage, carrier must be notified as 

soon as possible - preferably within five days.

4.  File the claim with the following support documents 

within a nine month statute of limitations.

• 

  Original or certified copy of the Bill of Lading, or 

indemnity bond.

•   Original paid freight bill or indemnity in lieu thereof.

• 

  Original or certified copy of the invoice, showing 

trade and other discounts or reductions.

•   Copy of the inspection report issued by carrier’s 

representative at the time damage is reported to 

carrier.

The carrier is responsible for making prompt inspection of 

damage and for a thorough investigation of each claim. 

The distributor or manufacturer will not accept claims from 

dealers for transportation damage.

Electrostatic Discharge (ESD) Precautions

NOTE: Discharge your body’s static electricity 

before touching unit. An electrostatic discharge 

can adversely affect electrical components.

Use the following precautions during furnace installation 

and servicing to protect the integrated control module 

from damage. By putting the furnace, the control, and the 

person at the same electrostatic potential, these steps 

will help avoid exposing the integrated control module to 

electrostatic discharge. This procedure is applicable to both 

installed and non-installed (ungrounded) furnaces.

1. 

Disconnect all power to the furnace. Do not touch 

the integrated control module or any wire connected 

to the control prior to discharging your body’s 

electrostatic charge to ground.

2.  Firmly touch a clean, unpainted, metal surface of the 

furnaces near the control. Any tools held in a person’s 

hand during grounding will be discharged.

3.  Service integrated control module or connecting 

wiring following the discharge process in step 2.  

Use caution not to recharge your body with static 

electricity; (i.e., do not move or shuffle your feet, do 

not touch ungrounded objects, etc.). If you come in 

contact with an ungrounded object, repeat step 2 

before touching control or wires.

4. 

Discharge your body to ground before removing a 

new control from its container. Follow steps 1 through 

3 if installing the control on a furnace. Return any old 

or new controls to their containers before touching 

any ungrounded object.

To The Installer

Before installing this unit, please read this manual 

thoroughly to familiarize yourself with specific items which 

must be adhered to, including but not limited to: unit 

maximum external static pressure, gas pressures, BTU 

input rating, proper electrical connections, circulating air 

temperature rise, minimum or maximum CFM, and motor 

speed connections.

WARNING

To prevent property damage, personal injury or death due to 

fire, do not install this furnace in a mobile home, trailer, or 

recreational vehicle. 

PRODUCT APPLICATION

This furnace is primarily designed for residential home-

heating applications. It is not designed or certified for use in 

mobile homes, trailers or recreational vehicles. Neither is it 

designed or certified for outdoor applications. The furnace 

must be installed indoors (i.e., attic space, crawl space, or 

garage area provided the garage area is enclosed with an 

operating door).

This furnace can be used in the following non-industrial 

commercial applications:

Schools, Office buildings, Churches, Retail stores, 

Nursing homes, Hotels/motels, Common or office 

areas.  

In such applications, the furnace must be installed with the 

following stipulations:

•   It must be installed per the installation instructions 

provided and per local and national codes.

•   It must be installed indoors in a building constructed 

on site.

•   It must be part of a ducted system and not used in a 

free air delivery application.

•   It must not be used as a “make-up” air unit.

•   It must be installed as a two-pipe systems for 

combustion air.

•   All other warranty exclusions and restrictions apply 

This furnace is an ETL certified appliance and is 

appropriate for use with natural gas.

• 

  Dual certification means that the combustion air inlet 

pipe is optional and the furnace can be vented as a:

•   Non-direct vent (single pipe) central forced air furnace 

in which combustion air is taken from the installation 

area or from air ducted from the outside or,

Содержание Amana MVS96 Series

Страница 1: ...se a matter of thinking before acting Most dealers have a list of specific good safety practices follow them The precautions listed in this Installation Manual are intended as supplemental to existing...

Страница 2: ...s the applicable Industry Canada technical specifications The manufacturer of the intentional radiator model no BGM111 is Silicon Laboratories Finland Oy which can be contacted by calling 617 951 0200...

Страница 3: ...rged to the outdoors Connect this furnace to an approved vent system only as specified in VENT FLUE PIPE COMBUSTION AIR PIPE section of this manual Never test for gas leaks with an open flame Use a co...

Страница 4: ...properly winterized and the water source closed In the event that the building may be exposed to freezing tempera tures and will be vacant any hydronic coil units should be drained as well and in such...

Страница 5: ...ntrol module or connecting wiring following the discharge process in step 2 Use caution not to recharge your body with static electricity i e do not move or shuffle your feet do not touch ungrounded o...

Страница 6: ...rds Institute 25 West 43rd Street 4th Floor New York NY 10036 National Fire Protection Association 1 Batterymarch Park Quincy MA 02169 7471 CSA International 8501 East Pleasant Valley Road Independenc...

Страница 7: ...garage position the furnace so that the burners and ignition source are located not less than 18 above the floor Protect the furnace from physical damage by vehicles If the furnace is installed horizo...

Страница 8: ...rmostat Location The thermostat should be placed approximately five feet from the floor on a vibration free inside wall in an area having good air circulation Do not install the thermostat where it ma...

Страница 9: ...awl space it must be suspended from the floor joist or supported by a concrete pad Never install the furnace on the ground or allow it to be exposed to water Figure 3 Front Cover Pressure Switch Tube...

Страница 10: ...t 5000 ft Manifold Pressure at 7500 ft CO2 Natural Gas Max Allowable Venting 3 in only MVS960603BU 100 ft MVS960805CU 80 ft 2 5 w c 2 4 w c 6 5 8 5 Table 2 Vent Pipe Combustion Air Pipe This manual wi...

Страница 11: ...vent connector and must not be vented into masonry chimney A masonry chimney may be used as a chase or passage way for approved venting materials providing the masonry chimney is not also being used t...

Страница 12: ...60805CU MODEL Pipe Size in Number of Elbows MVS960603BU 0 4 999 FT ALTITUDE 5 000 7 500 FT ALTITUDE MVS960805CU 3 3 100 MODEL Pipe Size in Number of Elbows MVS960603BU 69 93 87 81 75 63 57 80 43 37 73...

Страница 13: ...aft blower outlet When using the horizontal alternate vent configuration you must use the RF000142 vent drain kit See Figures 10 11 follow steps below NOTE In the horizontal left installation position...

Страница 14: ...The vent termination of a direct vent application must terminate at least 12 from any opening through which flue gases may enter a building door window or gravity air inlet The vent termination of ven...

Страница 15: ...HEIGHT DIFFERENCE 12 MIN TO ROOF OR HIGHEST ANTICIPATED SNOW LEVEL Vertical Termination Figure 14 STRAIGHT ELBOWS Figure 15 VENT FLUE TEE or 45 ELBOW TURNED DOWN or 90 ELBOW TURNED DOWN OPTIONAL 12 M...

Страница 16: ...es If more than one direct vent furnace is to be installed vertically through a common roof top maintain the same minimum clearances between the exhaust vent and air intake terminations of adjacent un...

Страница 17: ...ward slope toward the drain Do not trap the drain line in any other location than at the drain trap supplied with the furnace If the drain line is routed through an area which may see temperatures nea...

Страница 18: ...adapter 45 barb pipe adapter Installer selects right or left side drain and installs this hose accordingly Figure 25 Drain Exiting Right Side 1 Locate and Install the 45 pipe hose drain coupling from...

Страница 19: ...Location Figure 27 Horizontal Installation with Left Side Down Minimum 5 clearance is required for the drain trap beneath the furnace See Front Cover Pressure Switch Tube Location on Figure 27 1 Remo...

Страница 20: ...oving hole plugs Wiring Harness The wiring harness is an integral part of this furnace Wires are color coded for identification purposes Refer to the wiring diagram for wire routings If any of the ori...

Страница 21: ...ulator blower operation filter removal or routine maintenance To ensure proper unit grounding the ground wire should run from the furnace ground screw located inside the furnace junction box all the w...

Страница 22: ...2 C R C G Y 1 2 C Communicating Two Stage Air Conditioner or Heat Pump Figure 32 1 2 C R C G Y Optional Optional Optional INDOOR BOARD TERMINAL CONNECTIONS OUTDOOR BOARD TERMINAL CONNECTIONS 1 2 C R C...

Страница 23: ...nd is not an indication that the control board needs replacement EXTREMELY IMPORTANT For two stage gas heating the system only needs a single W input Internal algorithms will control the staging of th...

Страница 24: ...2 5 1000 3 8 1520 5 1 2040 1 3 520 2 6 1040 3 9 1560 5 2 2080 1 4 560 2 7 1080 4 1600 5 3 2120 1 5 600 2 8 1120 4 1 1640 5 4 2160 1 6 640 2 9 1160 4 2 1680 5 5 2200 1 7 680 3 1200 4 3 1720 5 6 2240 1...

Страница 25: ...ations The connection is designated as CONDENSATE IN OUT on the control board By default the connected AUX switch is normally closed and opens when the water level in the evaporator coil base pan reac...

Страница 26: ...changing any electrical wiring The accessory load specifications are as follows EAC 1 0 AMP maximum at 120 VAC Table 6 The furnace integrated control module is equipped with a line voltage accessory...

Страница 27: ...ns in the Safety Considerations on page 3 of this manual If you do not smell gas after five minutes move the furnace gas valve manual control to the ON position 8 Replace the burner compartment door 9...

Страница 28: ...and chips If old pipe is used be sure it is clean and free of rust scale burrs chips and old pipe joint compound Use pipe joint compound on male threads ONLY Always use pipe joint compound pipe dope t...

Страница 29: ...abinet Alternate Gas Line Location Plug in Alternate Gas Line Hole Ground Joint Pipe Union Gas Valve Ground Joint Pipe Union Manual Shut Off Valve upstream from ground joint pipe union Grommet in Stan...

Страница 30: ...static rating Total external static refers to everything external to the furnace cabinet Cooling coils filters ducts grilles registers must all be considered when reading your total external static pr...

Страница 31: ...and air leakage When the furnace is heating the temperature of the return air entering the furnace must be between 55 F and 100 F Filters Read This Section Before Installing The Return Air Duct work...

Страница 32: ...rated manometer or appropriate gas pressure gauge at either the gas valve inlet pressure tap or the gas piping drip leg See White Rodgers 36J22Y 204 gas valve figure below for location of inlet pressu...

Страница 33: ...m 10 Remove the manometer hose from the hose barb fitting or outlet pressure tap 11 Replace outlet pressure tap White Rodgers 36J22 valve Turn outlet pressure test screw in to seal pressure port clock...

Страница 34: ...eters must not be influenced by radiant heat by being able to see the heat exchanger 3 Subtract the return air temperature from the supply air temperature to determine the air temperature rise Allow a...

Страница 35: ...avoid personal injury or death due to electri cal shock disconnect electrical power BEFORE performing any service or maintenance Annual Inspection The furnace should be inspected by a qualified instal...

Страница 36: ...fied servicer using emery cloth or steel wool Following cleaning the flame sense signal should be above 3 micro amps Flue Passages Qualified Servicer Only The heat exchanger flue passageways should be...

Страница 37: ...s able to consecutively satisfy the thermostat under the set target time for this number of cycles the system will transition to the heat pump for primary heating SdP Menu is enabled if the CFS menu i...

Страница 38: ...ommunicating units AC Compressor Cooling Single Stage single stage non comm units AC1 Compressor Cooling Low Stage communicating units AC2 Compressor Cooling High Stage communicating units dHU Dehumid...

Страница 39: ...ensor Furnace fails to operate E1 Analog Pressure Error Blocked Vent Error Need to check the APS Sensor or its connection if this error is occurred The failure conditions occur as per the following fo...

Страница 40: ...erate Pressure switch circuit is closed at start of heating cycle Pressure switch contacts sticking Short in pressure switch circuit wiring Replace pressure switch Repair short in wiring Induced draft...

Страница 41: ...rom control replace if necessary Furnace fails to operate Polarity of 115 volt AC is reversed Poor unit ground Correct polarity check and correct wiring if necessary Verify proper ground correct if ne...

Страница 42: ...URNACE MUST BE REPLACED PK PLUG CONNECTION 2 4 BK DOOR OPEN OPEN WHEN DOOR SWITCH COMPARTMENT BLOWER SWITCH TEMPERATURE GND C BLOWER CIRCULATOR JUNCTION 40 VA 60 HZ DISCONNECT GAS VALVE 2 MANUFACTURER...

Страница 43: ...erence between Supply and Return Temperatures DB F GAS PRESSURES Gas Inlet Pressure IN W C Gas Manifold Pressure Low Fire IN W C Gas Manifold Pressure High Fire IN W C Gas Type NG Natural Gas LP Liqui...

Страница 44: ...purchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND GOODMAN BRAND AMANA BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of...

Отзывы: