background image

12

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

C

Y

Remote

Condensing Unit

(Single-Stage Cooling)

24 VAC

Thermostat

 

 

Y

1

Y2

 

R
C
G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C
G

C

Y

Remote

Condensing Unit

(Two-Stage Cooling)

24 VAC

Thermostat

Y2

Y

1

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Heat Pump

R
C

Y

Y

1

 

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Two Stage

Heat Pump

R
C

Y

Y2

Y2

Y

1

Y2

 

Y2

Non-communicating Two Stage A/C 

Figure 6B

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

C

Y

Remote

Condensing Unit

(Single-Stage Cooling)

24 VAC

Thermostat

 

 

Y

1

Y2

 

R
C
G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C
G

C

Y

Remote

Condensing Unit

(Two-Stage Cooling)

24 VAC

Thermostat

Y2

Y

1

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Heat Pump

R
C

Y

Y

1

 

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Two Stage

Heat Pump

R
C

Y

Y2

Y2

Y

1

Y2

 

Y2

Non-Communicating Single Stage Heat Pump 

Figure 6C

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

C

Y

Remote

Condensing Unit

(Single-Stage Cooling)

24 VAC

Thermostat

 

 

Y

1

Y2

 

R
C
G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C
G

C

Y

Remote

Condensing Unit

(Two-Stage Cooling)

24 VAC

Thermostat

Y2

Y

1

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Heat Pump

R
C

Y

Y

1

 

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Two Stage

Heat Pump

R
C

Y

Y2

Y2

Y

1

Y2

 

Y2

Non-Communicating Two Stage Heat Pump

Figure 6D

NOTE:

Equipment type (Single-stage cooling, Two-stage 

cooling, Single-stage heat pump, Two-stage heat pump) 

MUST

 be setup through the OdS menu by the installer for 

proper system operation. See Using Push-Button Switches 

for instructions on how to navigate the control menu.
This furnace is equipped with a 40 VA transformer to facilitate 

use with most cooling equipment.  Consult the wiring diagram, 

located on the blower compartment door, for further details of 

120 Volt and 24 Volt wiring.
A single-stage thermostat with only one heating stage is 

needed to control this furnace.  

120 Volt Line Connection of Accessories
Humidifier and Electronic Air Cleaner

HIGH VOLTAGE 

!

T

O

 

AVOID

 

PERSONAL

 

INJURY

 

OR

 

DEATH

 

DUE

 

TO

 

ELECTRICAL

 

SHOCK

DISCONNECT

 

ELECTRICAL

 

POWER

 

BEFORE

 

SERVICING

 

OR

 

CHANGING

 

ANY

 

ELECTRICAL

 

WIRING

.

WARNING

4.  Attach the junction box to the left side of the fur nace, 

using the screws removed in step 2.

5.  Check  the  location  of  the  wiring.  Confirm  that  it  will 

not be damaged by heat from the burners or by the 

rotation of the fan. Also confirm that wiring location will 

not interfere with fil ter removal or other maintenance.

After the junction box is in the desired location, use washers 

to connect field-supplied conduit to the junction box in accor

-

dance with NEC and local codes. Connect hot, neutral, and 

ground wires as shown in the furnace wiring diagram. The 

wires and ground screw are located in the furnace junction box.
Low voltage wires may be connected to the terminal strip. 

IMPORTANT NOTE: 

To avoid possible equipment malfunc-

tion, route the low voltage wires to avoid interference with filter 

removal or other maintenance. 

HIGH VOLTAGE 

!

T

O

 

AVOID

 

THE

 

RISK

 

OF

 

INJURY

ELECTRICAL

 

SHOCK

 

OR

 

DEATH

THE

 

FURNACE

 

MUST

 

BE

 

ELECTRICALLY

 

GROUNDED

 

IN

 

ACCORDANCE

 

WITH

 

LOCAL

 

CODES

 

OR

 

IN

 

THEIR

 

ABSENCE

WITH

 

THE

 

LATEST

 

EDITION

 

OF

 

THE

 

N

ATIONAL

 E

LECTRIC

 C

ODE

.

WARNING

To ensure proper unit grounding, the ground wire should run 

from the furnace ground screw located inside the furnace 

junction box all the way back to the electrical panel.  

NOTE:  

Do not use gas piping as an electrical ground.  To confirm 

proper unit grounding, turn off the electrical power and perform 

the following check.

1.  Measure resistance between the neutral (white) 

connection and the unpainted surface on the furnace. 

2.  Resistance should measure 10 ohms or less.

This furnace is equipped with a blower door interlock switch 

which interrupts unit voltage when the blower door is opened 

for servicing.  Do not defeat this switch.

24 Volt Thermostat Wiring

NOTE:

 Wire routing must not interfere with circulator blower 

operation, filter removal, or routine maintenance.

Low voltage connections can be made through either the right 

or left side panel. Thermostat wiring entrance holes are locat-

ed in the blower compartment.   The following figure shows 

connections for a “heat only” system and “heat/cool system”.

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

C

Y

Remote

Condensing Unit

(Single-Stage Cooling)

24 VAC

Thermostat

 

 

Y

1

Y2

 

R
C
G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C
G

C

Y

Remote

Condensing Unit

(Two-Stage Cooling)

24 VAC

Thermostat

Y2

Y

1

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Heat Pump

R
C

Y

Y

1

 

R
C

G

Y

Optional

Optional

INDOOR

 

BOARD TERMINAL

CONNECTIONS

 

R
C

G

24 VAC

Thermostat

Two Stage

Heat Pump

R
C

Y

Y2

Y2

Y

1

Y2

 

Y2

Non-communicating Single Stage A/C 

Figure 6A

Содержание Amana M9S80-U Series

Страница 1: ...stat Location 9 COMBUSTION AND VENTILATION AIR REQUIREMENTS 10 CATEGORY I VENTING VERTICAL VENTING 10 MASONRY CHIMNEYS 11 Masonry Chimney Termination 11 ELECTRICAL CONNECTIONS 11 Wiring Harness 11 120...

Страница 2: ...peed Selection 22 Heat Pump Heating Mode Speed Slection 22 Circulator Blower Fan Timing Adjustment 23 On Off Fan Delay Selection 23 OPERATIONAL CHECKS 23 Checking Duct Static 23 SAFETY CIRCUIT DESCRIP...

Страница 3: ...ce qui peut entra ner la mort des blessures ou des dommages mat riels IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL I...

Страница 4: ...nt pas suivies pour chacun des appareils raccord s au syst me de ventilation au moment de sa mise en marche cela peut entra ner une intoxication au monoxyde de carbone ou la mort Les tapes suivantes d...

Страница 5: ...ing precautions during furnace installation and servicing to protect the integrated control module from damage By putting the furnace the control and the person at the same electrostatic potential the...

Страница 6: ...furnace A return air temperature range between 60 F 16 C and 80 F 27 C is maintained Air filters are installed in the system and replaced daily during construction and upon completion of construction...

Страница 7: ...icals halogen type refrigerants printing inks cleaning solutions such as perchloroethylene paint removers varnishes hydrochloric acid cements and glues antistatic fabric softeners for clothes dryers m...

Страница 8: ...gas electrical and drain line connections NOTE In addition to the required clearances to combustible materials a minimum of 24 service clearance must be available in front of the unit Installation Po...

Страница 9: ...ndition c In so far as practical close all building doors and windows and all doors between the space in which the appliance s connected to the venting system are located and other spaces of the build...

Страница 10: ...oset or utility room must have two ventilation openings with a total minimum free area of 0 25 square inches per 1 000 BTU hr of furnace input rating Refer to Specification Sheet applicable to your mo...

Страница 11: ...ation purposes Refer to the wiring diagram for wire routings If any of the original wire as supplied with the furnace must be replaced it must be replaced with wiring material having a temperature rat...

Страница 12: ...NG OR CHANGING ANY ELECTRICAL WIRING WARNING 4 Attach the junction box to the left side of the fur nace using the screws removed in step 2 5 Check the location of the wiring Confirm that it will not b...

Страница 13: ...e is equipped with de di cated inch EAC and HUM relay terminals for controlling external power to an optional field supplied humidifier and or electronic air cleaner Additional line voltage wiring to...

Страница 14: ...90 170 350 530 90 40 84 160 320 490 100 38 79 150 305 460 Pressure 0 5 psig or less and pressure drop of 0 3 W C Based on 0 60 Specific Gravity Gas CFH BTUH Furnace Input Heating Value of Gas BTU Cubi...

Страница 15: ...he furnace should be installed in parallel with or on the upstream side of the cooling unit to avoid condensa tion in the heating element With a parallel flow arrange ment the dampers or other means u...

Страница 16: ...thermostat contacts close initiating a call for heat The control will display heat mode in status menu g h Integrated control module performs safety circuit checks Induced draft blower is energized fo...

Страница 17: ...od The electronic air cleaner EAC and humidifier HUM relays will close the contacts After the thermostat is satisfied the compressor is de energized and the electronic air cleaner EAC and humidifier H...

Страница 18: ...The control is now ready to receive demands from the room thermostat Refer to Status Menu in this manual for interpretation of items displayed in the status menu Quick Start Initial set up of outdoor...

Страница 19: ...irculation blower will shut down when the time delay expires Time delay is selectable on all models 2 Turn off the electrical power supply to the furnace 3 Remove the burner compartment door 4 White R...

Страница 20: ...re gauge at the gas valve outlet pressure tap See White Rodgers 36J22Y 204 gas valve Figure 13 for location of outlet pressure tap 5 Turn ON the gas supply 6 Turn ON power and close thermostat R and W...

Страница 21: ...the supply air temperature to determine the air temperature rise Allow adequate time for thermometer readings to stabilize 4 Adjust temperature rise by adjusting the circulator blower speed Increase...

Страница 22: ...Cooling Speed Table Gas Heating Mode Speed Selection To change the main blower speed in GAS HEATING mode see the following steps 1 Press menu button until LED displays gAF Press option button and LED...

Страница 23: ...ic refers to everything external to the furnace cabinet Cooling coils filters ducts grilles registers must all be considered when reading your total external static pressure The supply duct pressure m...

Страница 24: ...horizontal right and horizontal left installations Regardless of airflow direction it does not need to be relocated Burner Temperature Switch The burner temperature switch is mounted on the burner ass...

Страница 25: ...lubricated by the manufacturer No further lubrication is required Check motor windings for accumulation of dust which may cause overheating Clean as necessary Flame Sensor Qualified Servicer Only Und...

Страница 26: ...ailable from your distributor Functional Parts List Gas Valve Natural Gas Orifice Burner Assembly Hot Surface Igniter Flame Sensor Gas Manifold Ignition Control Blower Mounting Bracket Pressure Sensor...

Страница 27: ...ntegrated Control Module 10 Transformer 11 Blower Door Interlock Switch 12 Circulator Blower Tubular Heat Exchanger Pressure Sensor Assembly Flue Pipe Connection Gas Line Entrance Gas Valve Inducer Ga...

Страница 28: ...o call for heat Correct short at flame sensor or in flame sensor wiring Short to ground in flame sense circuit Lingering burner flame Slow closing gas valve Open fuse Replace fuse Short in low voltage...

Страница 29: ...sor and pressure switch Check Red Black Green harness connections to pressure sensor control board Replace pressure sensor Check Red Black Green harness connections to pressure sensor control board Re...

Страница 30: ...72 1353 1325 1291 1255 1219 SP6 1528 1485 1438 1409 1383 1349 1317 1285 SP7 1619 1579 1551 1523 1495 1463 1430 1402 SP8 1746 1697 1667 1642 1617 1593 1570 1540 SP9 1772 1735 1698 1674 1645 1622 1598 1...

Страница 31: ...1485 30 1438 31 1409 32 1383 32 1349 1317 1285 SP7 1619 27 1579 28 1551 29 1523 29 1495 30 1463 1430 1402 SP8 1746 25 1697 26 1667 27 1642 27 1617 27 1593 1570 1540 SP9 1772 25 1735 26 1698 26 1674 27...

Страница 32: ...9 R233 R243 R245 NTC1 R209 R212 R215 R219 R227 R231 R248 R261 R208 R283 R61 R86 R87 R103 R107 R141 R203 Y1 Y2 R76 R238 R262 R8 R40 R44 R45 R46 R55 R70 R74 R75 R81 CR1 CR8 CR11 CR12 C R15 CR16 CR2 0 CR...

Страница 33: ...lta T Difference between Supply and Return Temperatures DB F GAS PRESSURES Gas Inlet Pressure IN W C Gas Manifold Pressure Low Fire IN W C Gas Manifold Pressure High Fire IN W C Gas Type NG Natural Ga...

Страница 34: ...34 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 35: ...35 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 36: ...rchased to be directed to the feedback page GOODMAN BRAND AMANA BRAND GOODMAN BRAND AMANA BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of the...

Отзывы: