16
2. Starting the machine for the first time
After you have established the connection between the mains
supply and the machine, set the master switch to
"1 ON"
. The
control cabinet is then supplied with electric power. The master
switch is located in the door of the control cabinet.
When the "EMERGENCY SHUT-OFF" is depressed,
"CONTROL ON" is not possible!
When starting up the machine, be sure to check that the
"EMERGENCY SHUT-OFF"
switches (there are two of them)
are not depressed and locked into place.
To bring the soil hopper into the loading position, push down
the HYDRAULIC LEVER (2) and hold it down until the position
is reached. If the soil hopper does not move, then the direction
of rotation has to be changed on the supply line. (Pay attention
to the direction-of-rotation arrow for the pump motor.)
Move the soil hopper into the unloading position. When
reached, the "In position" lamp will light up. Release the lever.
When you then press the "START" button, all the electric
functions on the Big Bale Breaker will be ready to operate.
The scraping chain and break-up system will begin to run (the
laser sensor must not be engaged).
Stop the scraping chain and the break-up system by moving out
of the unloading position or by pressing the "STOP" button.
3. Start Check after the first start-up
If there are no irregularities during the trial run (such as unusual
noises), the machine can be operated as described in the
section "Operation".
Содержание 6160 Big Bale Breaker
Страница 10: ...9 ...
Страница 20: ...19 2 3 Control lever 1 Unloading direction 0 Standby position 2 Loading direction Main switch ...
Страница 21: ...20 ...
Страница 33: ...32 10 Part list ...