MAY DMZ329 Скачать руководство пользователя страница 9

 
 

Stand 40-081 

English 

page 9 of 9 

Foundation installation conditions 

Before installation of a ground screw, a foundation installation condition sheet must be signed. This 
template is a translation of a year 2011 copy from the Krinner company. If applicable, please request an 
updated version. A signed copy should be archived by the “ground screw service”.  
 
Project: 
 
Scheduled date:                                  Scheduled time:   

 

The points of installation have been checked and are free of obstacles such as ground cables or 
underground constructions.  

 

The points of installation are marked and levelled. 

 

Cable diagrams are available. 

 

It is confirmed there are no underground cables (gas pipes, water, telephone, power supply, etc.) 
within a radius of 50 cm around the point of installation.  

 

There must be free access for the installation machines to the points of installation plus 3m x 3m 
around, installation points must be marked.  

 

In case the start of construction cannot be met as scheduled, please inform us 2 working days 
ahead. 
 

 
paved  ground ________________________      yes 

          no 

tarred ground ________________________      yes 

          no 

underground construction/waste _________ 

yes 

 

no 

 
Soil class:   

 

 

 
Terrain characteristic: 
 
 
 
 
 
Installation of ground screws into a rocky ground or into a rock, removal of paving and core drilling though 
asphalt are available at special service.  
 
Further information: 
 
 
 
 
 
Remark:  In case of swampy ground, increased groundwater level, flood, muddy ground caused by strong 

rain or ground frost, ground screws cannot be installed. The offered price applies to the specified 
service. Any additional effort or service must be invoiced based on hourly rate. If during 
assembly it turns out that the installation of the ground screws cannot be conducted or only with 
excessive material and cost expenditure, we are not obliged to provide any service at these 
positions. This does not affect any further parts of the contract. The German law on contracts 
for work & services (BGB), current version, applies.      

 
Warranty: 

Warranty excluded in case of natural changes of the ground like sinking, landslide, flood, 
earthquake. 

 
 

 

 
Date 

 

 

 

Signature customer, stamp

 

Содержание DMZ329

Страница 1: ...ting instructions can result in personal injuries or damage to property Please note that if these instructions are not observed the manufacturer cannot assume any liability or guarantee Always follow...

Страница 2: ...ing machine is suitable or whether a larger machine must be used This soil analysis is only binding in case of a homogeneous soil fabric 4 This manual illustrates the 5 steps to fasten the ground scre...

Страница 3: ...the vertical predrill Pay attention to the chapter Placing the ground screw 2 Step 2 Preparation For preparation for the 2 m ground screw a smaller ground screw about 1 2 m long must be screwed in and...

Страница 4: ...arried out by your MAY dealer 1 Step 4 Alignment See chapter Alignment and fixation of upper anchor tube for detailed instruction 4 Step 5 Finish Fill up the gravel and place the paving as close as po...

Страница 5: ...ork loose If screws are not tightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may...

Страница 6: ...firmly yet 3 As a practical matter the ground screw is never screwed in 100 straight Therefore the upper part must be aligned with a water spirit level see fig Adjust the set screw and the M 16 screw...

Страница 7: ...h parasol and its corresponding accessories should be marked during dismounting with punch marking or waterproof marker e g for winter storage Marking saves a lot of time and helps to keep things in o...

Страница 8: ...0 telescopic guiding rod system guiding safety bar screw in attachment F1234567 4 Cable reel 5 1 2 m ground screw 6 Spade shovel small trowel 7 Spirit level tape measure possibly 8 Folding rule 9 Hexa...

Страница 9: ...uled please inform us 2 working days ahead paved ground ________________________ yes no tarred ground ________________________ yes no underground construction waste _________ yes no Soil class Terrain...

Отзывы: