MAY DMZ329 Скачать руководство пользователя страница 3

 
 

Stand 40-081 

English 

page 3 of 9 

5 steps to fasten the ground screw  

Preliminary, let the property owner / customer sign the foundation installation conditions (see 

page 8) and archive it legally.  

 

1.

 

Step 1: Removal and primary drilling 

Remove paving and gravel until a depth of approximately 15 cm. Use a ø 40 mm drill for 
the vertical predrill. Pay attention to the chapter “Placing the ground screw“. 

 

 
2.

 

Step 2: Preparation 

For preparation for the 2 m ground screw a smaller ground screw, about 1.2 m long, must 

be screwed-in and out again. 

 

 
3.

 

Step 3: Screwing-in  

Screw-in the 2 m ground screw until there is a space of 19 mm between top of terrace and 

top of ground screw. This ensures the winter coverage will be even with the ground. In 

case of multiple parasols use an optical level to have all ground screws screwed-in to the 

same depth.   

 

 

 

19mm 

Содержание DMZ329

Страница 1: ...ting instructions can result in personal injuries or damage to property Please note that if these instructions are not observed the manufacturer cannot assume any liability or guarantee Always follow...

Страница 2: ...ing machine is suitable or whether a larger machine must be used This soil analysis is only binding in case of a homogeneous soil fabric 4 This manual illustrates the 5 steps to fasten the ground scre...

Страница 3: ...the vertical predrill Pay attention to the chapter Placing the ground screw 2 Step 2 Preparation For preparation for the 2 m ground screw a smaller ground screw about 1 2 m long must be screwed in and...

Страница 4: ...arried out by your MAY dealer 1 Step 4 Alignment See chapter Alignment and fixation of upper anchor tube for detailed instruction 4 Step 5 Finish Fill up the gravel and place the paving as close as po...

Страница 5: ...ork loose If screws are not tightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may...

Страница 6: ...firmly yet 3 As a practical matter the ground screw is never screwed in 100 straight Therefore the upper part must be aligned with a water spirit level see fig Adjust the set screw and the M 16 screw...

Страница 7: ...h parasol and its corresponding accessories should be marked during dismounting with punch marking or waterproof marker e g for winter storage Marking saves a lot of time and helps to keep things in o...

Страница 8: ...0 telescopic guiding rod system guiding safety bar screw in attachment F1234567 4 Cable reel 5 1 2 m ground screw 6 Spade shovel small trowel 7 Spirit level tape measure possibly 8 Folding rule 9 Hexa...

Страница 9: ...uled please inform us 2 working days ahead paved ground ________________________ yes no tarred ground ________________________ yes no underground construction waste _________ yes no Soil class Terrain...

Отзывы: