MAY DMZ329 Скачать руководство пользователя страница 8

 
 

Stand 40-081 

English 

page 8 of 9 

Mounting – Tools required 

 

1.

 

SZ329 / SZ330 (upper anchor tube + ground screw KSF F 140x1200-M by Krinner) 
including MAY standard parts. 
 

2.

 

Hammer drill with ø40 rock drill. 

 

3.

 

Krinner screw-in machine KR20, telescopic guiding rod system, guiding safety bar, screw-
in attachment F1234567. 

 

4.

 

Cable reel 

 

5.

 

1.2 m ground screw  

 

6.

 

Spade, shovel, small trowel 

 

7.

 

Spirit level + tape measure (possibly) 

 

8.

 

Folding rule 

 

9.

 

Hexagon key in size 3, 4, 8 and 14 

 

10.

 

Open-ended spanner size 17 + 19 

 

11.

 

Ring spanner size 24 

 

12.

 

In case of multiple parasols: optical level, ground marking spray, centring plate for rock 
drill and soil spikes for fixation (custom made). 

 

 
 

 

 
 

 
 

 

 
 

 
 

 

 
 

 
 

Содержание DMZ329

Страница 1: ...ting instructions can result in personal injuries or damage to property Please note that if these instructions are not observed the manufacturer cannot assume any liability or guarantee Always follow...

Страница 2: ...ing machine is suitable or whether a larger machine must be used This soil analysis is only binding in case of a homogeneous soil fabric 4 This manual illustrates the 5 steps to fasten the ground scre...

Страница 3: ...the vertical predrill Pay attention to the chapter Placing the ground screw 2 Step 2 Preparation For preparation for the 2 m ground screw a smaller ground screw about 1 2 m long must be screwed in and...

Страница 4: ...arried out by your MAY dealer 1 Step 4 Alignment See chapter Alignment and fixation of upper anchor tube for detailed instruction 4 Step 5 Finish Fill up the gravel and place the paving as close as po...

Страница 5: ...ork loose If screws are not tightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may...

Страница 6: ...firmly yet 3 As a practical matter the ground screw is never screwed in 100 straight Therefore the upper part must be aligned with a water spirit level see fig Adjust the set screw and the M 16 screw...

Страница 7: ...h parasol and its corresponding accessories should be marked during dismounting with punch marking or waterproof marker e g for winter storage Marking saves a lot of time and helps to keep things in o...

Страница 8: ...0 telescopic guiding rod system guiding safety bar screw in attachment F1234567 4 Cable reel 5 1 2 m ground screw 6 Spade shovel small trowel 7 Spirit level tape measure possibly 8 Folding rule 9 Hexa...

Страница 9: ...uled please inform us 2 working days ahead paved ground ________________________ yes no tarred ground ________________________ yes no underground construction waste _________ yes no Soil class Terrain...

Отзывы: