MAY DMZ329 Скачать руководство пользователя страница 7

 
 

Stand 40-081 

English 

page 7 of 9 

Storage / dismounting 

 

1.

 

Lift the parasol from the anchor tube.  

 

2.

 

Remove the upper anchor tube completely. 

 

3.

 

Screw threaded pins into the bore holes flush with the plate (see fig.)   

 

The thread may get damaged. 
Without cover plate, dirty water or sand may be washed into the flanks of the 
thread. As sand is harder than steel, the thread may get damaged when the 

screw is turned. 

 

Screw in the threaded pins flush with the plate. 

 
 

 

 
 

 

 

 

 
4.

 

In case you have two or more parasols, each parasol and its corresponding accessories 

should be marked during dismounting (with punch marking or waterproof marker, e.g. for 

winter storage).  
 

  

Marking saves a lot of time and helps to keep things in order. 

 
If clearly marked, each sunshade can easily be assigned to its proper location 

and re-erected parallel to the wall of the house or next to the others.  

 

For clear and easy later assignment use the same number to mark the centre 
pole, the anchor tube and the ground tube. For example, for sunshade No. 1, 

all three parts should carry number 1, all three parts of sunshade No. 2 
should be marked with a 2, etc. 

 
 

 

5.

 

Lubricate the screws on a regular basis to prevent rust. 

 

 

 

Caution 

threaded pins M16 

 

Tip 

Содержание DMZ329

Страница 1: ...ting instructions can result in personal injuries or damage to property Please note that if these instructions are not observed the manufacturer cannot assume any liability or guarantee Always follow...

Страница 2: ...ing machine is suitable or whether a larger machine must be used This soil analysis is only binding in case of a homogeneous soil fabric 4 This manual illustrates the 5 steps to fasten the ground scre...

Страница 3: ...the vertical predrill Pay attention to the chapter Placing the ground screw 2 Step 2 Preparation For preparation for the 2 m ground screw a smaller ground screw about 1 2 m long must be screwed in and...

Страница 4: ...arried out by your MAY dealer 1 Step 4 Alignment See chapter Alignment and fixation of upper anchor tube for detailed instruction 4 Step 5 Finish Fill up the gravel and place the paving as close as po...

Страница 5: ...ork loose If screws are not tightened firmly enough there will not be sufficient tensile force to trigger self locking If the screws are tightened too firmly and over stressed the screw connection may...

Страница 6: ...firmly yet 3 As a practical matter the ground screw is never screwed in 100 straight Therefore the upper part must be aligned with a water spirit level see fig Adjust the set screw and the M 16 screw...

Страница 7: ...h parasol and its corresponding accessories should be marked during dismounting with punch marking or waterproof marker e g for winter storage Marking saves a lot of time and helps to keep things in o...

Страница 8: ...0 telescopic guiding rod system guiding safety bar screw in attachment F1234567 4 Cable reel 5 1 2 m ground screw 6 Spade shovel small trowel 7 Spirit level tape measure possibly 8 Folding rule 9 Hexa...

Страница 9: ...uled please inform us 2 working days ahead paved ground ________________________ yes no tarred ground ________________________ yes no underground construction waste _________ yes no Soil class Terrain...

Отзывы: