11921
Slauson
Ave.
Santa
Fe
Springs,
CA.
90670
(800)
227-41
16
F
AX
(888)
771-7713
PAGE 26
PLATFORM OPENER
1.
Fold the Flipover onto
the Platform, and raise the
Platform to the folded posi-
tion, (approximately 5° from
vertical).
2.
Position the Opener
on top of the Mainframe
Weldment, and slide the
Opener to where it butts up
against the folded Platform.
Tack weld into position.
FLIPOVER
PLATFORM
PLATFORM
OPENER
MAINFRAME
3.
Open and close Platform several times to insure there will be no
interference with this location, and weld all around to the Mainframe.
5°
WELD BOTH SIDES
(TYP. BOTH
PLATFORM OPENERS)
MAINTAIN 1 GAP
(TYP.)