Preparing for installation
15
3.6 Installing the cables/preparation
IMPORTANT:
Excess cable must not be wound up
in a coil but must be placed in slings.
(Fig. 15).
3.6.1 Cable to the platform
Route the control unit cable for
platform connection (white
plastic cover) to the swing-arm
assembly in the center of the
vehicle (Fig. 16).
3.6.2 Cable for the service
switch
Route the control unit cable for
service switch connection to the
vehicle cargo area (Fig. 17).
Fig. 16
Fig. 17
Fig. 15
Содержание GPC X1-LDF
Страница 1: ...GPC X1 LDF liftgate Installation Manual for Mercedes Benz Sprinter...
Страница 11: ...Introduction 5 2 1 4 Accessories kit Fig 4...
Страница 13: ...Introduction 7 2 1 5 Installation adapter kit 22 911 216 Fig 5...
Страница 71: ...Useful information 65 8 2 Assembly drawings of installation adapters...
Страница 72: ...Useful information 66 8 3 Electrical circuit diagram...
Страница 73: ...Useful information 67 8 4 Hydraulic circuit diagram...