49
1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
RUN GRAVITY DOWN HYDRAULIC LINES
STEP 8 - RUN HYDRAULIC LINES & ELECTRIC CABLES
- Continued
GRAVITY DOWN PUMP BOX INSTALLATION: REQUIRED HOSES & PLASTIC TUBING
20 FT.
28 FT.
1
HP 3/8” X 316” LG.
HP 3/8” X 412” LG.
2
HP 3/8” X 394” LG.
HP 3/8” X 490” LG.
3
HP 1/4” X 308” LG.
HP 1/4” X 404” LG.
4
PLASTIC 3/8” OD X 324” LG.
PLASTIC 3/8” OD X 420” LG.
TABLE 49-1
GRAVITY DOWN PUMP BOX INSTALLATION: REQUIRED HOSES & PLASTIC TUBING
3 FT.
10 FT.
15 FT.
1
HP 3/8” X 72” LG.
HP 3/8” X 196” LG.
HP 3/8” X 256” LG.
2
HP 3/8” X 150” LG.
HP 3/8” X 274” LG.
HP 3/8” X 334” LG.
3
HP 1/4” X 64” LG.
HP 1/4” X 188” LG.
HP 1/4” X 248” LG.
4
PLASTIC 3/8” OD X 84” LG.
PLASTIC 3/8” OD X 192” LG.
PLASTIC 3/8” OD X 264” LG.
TABLE 49-2
NOTE:
Each pump extension kit contains 2 hoses of the same length
(item 3)
.
One hose is for the
Platform Fold Line
and the second hose is for the
Platform Unfold Line
. One hose has a yellow band on each connector
to help connect the 2 hoses to the correct
fi
ttings. For example, connect
hose with yellow bands to the
Fold Line
on the RH column and the
Fold
Line
on the back of the pump box.
NOTE:
For torque values for the hydraulic hose connectors, see
TABLES 50-1,
50-2 & 50-3
.
Содержание BMR-CS
Страница 103: ......