102
1
1921 Slauson
A
ve. Santa Fe Springs, CA. 90670 (800) 227-41
16 F
AX (888) 771-7713
Operation Inspection:
All BMR-CS
Liftgate operates correctly using all main &
optional control switches.
Platform unfolds in 5 to 7 sec.
Platform can be lowered onto the bottom stop
position for dock loading, and 1” below the
threshhold plate.
Platform folds in 5 to 7 sec.
Unloaded platform lowers in
8 to 20 sec
.
Unloaded platform raises in
9 to 21 sec
.
Unloaded platform raises and lowers evenly in
GD and PD modes. Maximum 1” difference of
runners from side to side.
Platform stores securely behind both column
wedges.
Cycle counter indicates total number of up and
down cycles and adds 1 more count each time
platform is raised and lowered.
Decals in correct location and legible.
Verify all lights are operational
Platform lights turn
ON
when platform is un-
folded, and turn
OFF
when platform is stowed.
Taillights, stop lights, turn lights, and backup
lights turn
ON
and
OFF
correctly.
Pre-Installation Inspection:
Correct model
Correct capacity
Correct platform size
Correct options
Correct manuals & decals
Structural Inspection:
Liftgate is centered on vehicle rear door &
mounted per dimensions in this manual.
Pump box is mounted securely.
All installation welds are done per instructions
in this manual.
All roll pins, bolts & fasteners on liftgate
are tight.
All hardware & fasteners, used to secure
liftgate to vehicle body, are tight.
Ensure platform ramp touches ground when
runner is 1” above ground. The main platform
&
fl
ipover surfaces should be level to one
another and rest evenly when touching the
ground.
Verify runner slide pads are in adjustment per
STEP 18
in this manual.
Hydraulic Inspection:
Fluid is at correct level (See
OPTIMIZE HY-
DRAULIC FLUID LEVEL
step in this manual.)
No leaks from hydraulic
fi
ttings in pump box
No leaks from hydraulic line connections
Electrical Inspection:
Power/charge plug and terminals are clean &
tight.
Individual wire connections are tight.
Circuit breaker (150A) is installed in battery box
(if equipped) or by truck/tractor battery.
Batteries are fully charged, all cable
connections are tight & tiedowns are tight.
Solenoid wiring connections are tight.
Wiring harness connections are tight.
Electrical cable connections are tight &
secured clear of moving parts & sharp edges.
Model:______________________ Date:
____________________
Serial Number: _______________
Technician: _______________
PRE-DELIVERY INSPECTION FORM
Important!
This pre-delivery checklist is to aid the installer in con
fi
rming the proper installation of
this Maxon product. It is not a comprehensive list and does not replace the use of the installation
manual. The installer is responsible for following all instructions in the installation manual.
NOTE:
The following times are for 56” bed
height, aluminum platform and
fl
ipover, 85” W x 42” + 42” L, Exxon
Univis HVI-13 oil, & temperature at
70°F. Times are for reference only
and may vary for larger platforms,
smaller platforms, steel platforms, or
temperature changes.
Содержание BMR-CS
Страница 103: ......