i-32V5
Pompe di calore inverter aria/acqua con ventilatori assiali
4
10.2.2 HEATING MODE ON DHW STORAGE TANK
.......................................................18
10.2.3 INSUFFICIENT HEAT EXCHANGE IN A DHW SYSTEM
.......................................18
10.3 REMOTE-CONTROLLED FUNCTIONS
....................................................................18
10.3.1 ON/OFF
................................................................................................................ 18
10.3.2 SUMMER/WINTER MODE CHANGE
..................................................................19
10.3.3 DHW CALL FROM DIGITAL INPUT
......................................................................19
10.4 SYSTEM WATER REMOTE PROBE
..........................................................................19
10.5 AUXILIARY HEATERS
..............................................................................................19
10.5.1 PLANT HEATER
.................................................................................................... 19
10.5.2 PLANT HEATER IN DEFROST
...............................................................................20
10.5.3 DHW HEATER
...................................................................................................... 20
10.5.4 SINGLE PLANT/DHW INTEGRATION HEATER
....................................................20
10.6 INTEGRATION HEATER SELECTION MODE
...........................................................20
10.7 CIRCULATOR MANAGEMENT WITH HEATER ON
.................................................20
10.8 BOILER ENABLING
.................................................................................................20
10.9 ACTIVATION OF INTEGRATION HEATERS AND BOILER IN JOINT OPERATION AND
IN SUBSTITUTION OF HEAT PUMP COMPRESSOR
.........................................................21
10.9.1 OPERATION IN HEAT PUMP MODE
...................................................................21
10.9.2 JOINT OPERATION (I BRACKET)
.........................................................................21
10.9.3 JOINT OPERATION (II BRACKET)
........................................................................21
10.9.4 OPERATION IN SUBSTITUTION
..........................................................................22
10.10 OPERATING BRACKETS - ACTIVATION OF INTEGRATION HEATERS (PLANT RE-
MOTE WATER PROBE NOT ENABLED)
.............................................................................22
10.10.1 AUXILIARY SYSTEMS OFFSET MANAGEMENT
................................................25
10.11 WARNINGS
........................................................................................................... 25
10.11.1 PLANT SEASON
.................................................................................................25
10.11.2 ALARM
............................................................................................................... 25
10.11.3 MACHINE BLOCK
...............................................................................................25
10.11.4 DEFROST
............................................................................................................ 25
10.12 DEFROST CYCLE
.................................................................................................... 25
10.13 COMPRESSOR CRANKCASE HEATER
...................................................................26
10.14 DOUBLE SET-POINT
.............................................................................................26
10.15 MINIMUM HZ FUNCTIONALITY
..........................................................................26
10.16 MAXIMUM HZ FUNCTIONALITY
.........................................................................26
10.17 FLOWMETER
........................................................................................................ 26
11.FUNCTIONS THAT CAN BE ACTIVATED WITH HI-T2 ACCESSORY (OPTIONAL)
........27
12.FUNCTIONS THAT CAN BE ACTIVATED WITH GI MODULE (OPTIONAL)
..................27
12.1 I/O RESOURCES OF THE CONTROLLER
.................................................................27
12.2 MANAGEMENT OF SECONDARY CIRCULATOR/BOOSTER PUMP (WITH ROOM
THERMOSTAT)
................................................................................................................... 28
12.3 MIXER VALVE MANAGEMENT
..............................................................................28
12.3.1 DETERMINATION OF SETPOINT
........................................................................28
12.3.2 RADIANT PANELS CIRCUIT PUMP
......................................................................28
12.3.3 MIXER VALVE
....................................................................................................... 28
12.4 SOLAR INTEGRATION MANAGEMENT
.................................................................29