background image

MAX POWER 

 
 
 

 
 

INTRODUCTION  

 
 

AFTER SALES SERVICE  

 

 
ADDRESS :  
 

MAX POWER 

Via Philips 5, 20900, Monza (MI), Italy 

 

TEL :  + 3

9 039 200 1973-936

 

 

FAX:   + 3

9 039 2004299

 
RETRACT SERIAL N°  

S   0 1. R600. _.   _ _    _  _  

 
 

IMPORTANT GENERAL INFORMATION  

 
With a constant concern of improving our products, we reserve the right to make 
changes to this manual without prior notification.  
 
All statistics and explanations within this manual were believed to be correct at the 
time of printing.  
 
Each RETRACT installation requires a preliminary study of performance and 
feasibility.  
This study covers 3 distinct sub systems:  
 
1.  The RETRACT thruster unit, (positioning, space available, structural compatibility 

etc) 

2.  Hydraulic equipment, (positioning equipment, power available, flows pressures 

pipe sizes etc) 

3.  Electrical equipment, (positioning, power supply, PLC sequencing, protection / 

isolation, etc) 

 
 

CHECK LIST FOR THE PROJECT MANAGER  

 
It is very important to carefully read the entire manual before starting the installation. 
 

 

- 3                  INSTALLATION MANUAL RETRACT  R 600                  

 

Содержание RETRACT R600 Series

Страница 1: ..._ __ __ __ __ __ _ B BU UI IL LT T B BY Y _ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ _ D DE EL LI IV VE ER RE ED D _ __ __ __ __ __ __ __ __ __ _ A copy of this manual must remain on board for con...

Страница 2: ...O THE MOUNTING BASE P7 FINAL ADJUSTING OF THE CLOSING PLATE P8 RAISE LOWER POWER PACK INSTALLATION P8 TRANSMISSION LUBE OIL TANK INSTALLATION P9 HYDRAULIC POWER SYSTEM INSTALLATION P9 ELECTRICAL SYSTE...

Страница 3: ...ieved to be correct at the time of printing Each RETRACT installation requires a preliminary study of performance and feasibility This study covers 3 distinct sub systems 1 The RETRACT thruster unit p...

Страница 4: ...on the form provided and sent to Max Power by fax no later than one week after the water tests have been completed so that the Max Power standard warranty is correctly validated This form is attached...

Страница 5: ...chanical stresses are spread over the hull by the mounting base and the guide blocks Installation which should be executed by welding or bonding to the hulls plating normally reinforces the hull the m...

Страница 6: ...points Score the bracket and the mounting points to mark the position in witch it is fitted 1 Raise the thrusters to its highest position and then remove the locking knuckles Fit the locking point ad...

Страница 7: ...e aluminium case The nuts should be NYLOCK self locking type The 4 lifting lugs provided by MAX POWER should be put in a small plastic bag along with the hydraulic pipe plugs for storage and future us...

Страница 8: ...piping reservoir pump directional valve etc should be installed in compliance with the usual rules of accessibility to enable periodic checks and maintenance MAX POWER recommends the use of ISO GRADE...

Страница 9: ...nd dry place The DCV block used must be equipped with a pressure gauge so as to check operating pressure on commissioning and for maintenance The block must be equipped with a pressure relief valve se...

Страница 10: ...y a two pole 32 amp circuit breaker not supplied by Max Power which should normally be located on the main electrical panel CONTROL SYSTEM PLC NON MAX POWER SUPLLY If the max power control box is not...

Страница 11: ...top plate has been replaced if it was removed during installation and that all the lower flange bolts have been tightened Torque for all these bolts is 5 kg m Filling the hydraulic circuit MAX POWER...

Страница 12: ...l remains stable Warning All hydraulic systems develop very high pressures Failure of piping connections etc that have been improperly installed will most likely happen on start up Stay clear of these...

Страница 13: ...nit has 24 vdc powers to the motor Check that the pump operates in down position before the thruster starts PROBABLE CAUSE 2 position switches out of adjustment REMEDY Readjust the position switches b...

Страница 14: ...ls 4 Remove the propellers and check oil seals replace if necessary 5 Inspect and repair the hull closing plate gasket for deterioration or missing pieces Check and tighten if necessary the plate fixa...

Страница 15: ...MAX POWER PROJECT MANAGER S TEST RESULTS FORM To be filled out and Faxed to MAX POWER 15 INSTALLATION MANUAL RETRACT R 600...

Страница 16: ...ions concerning the installation YES NO 1 Is the RETRACT mounted parallel with the bottom of the hull 2 Is there enough room for general maintenance of the RETRACT and its auxiliary equipment 3 Does t...

Страница 17: ...nning either direction 1 Record the voltage at the remote control box Volts 2 Record the hydraulic pressure slow speed Bars 3 Record the hydraulic pressure full speed Bars 4 Record the hydraulic flow...

Страница 18: ...y 46 csst UNIT SPECIFICATIONS Maximum Power 75kw Total weight unit 300kg Propellor diameter 600mm Propellor thrust 1000kg HYDRAULIC RAM SPECIFICATIONS Maximum Pressure 70 bar Maximum flow 3 lpm ELECTR...

Страница 19: ...th of one full turbine diameter should be respected and the thrusters should be as far forward or aft as possible The Thruster should be paralell with the botom of the hull WL WL 140 Hull Opening 765...

Страница 20: ...MAX POWER 600 20 0 FLANGE MAX POWER Retract R600 Construction point Y G T 09 02 01 A Ver Des Date 1 By Construction point Construction point 20 INSTALLATION MANUAL RETRACT R 600...

Страница 21: ...ersion depth of one full turbine diameter should be respected and the thrusters should be as far forward or aft as possible WL The Retract must be paralell with the botom of the hull Hull Opening 140...

Страница 22: ...MAX POWER Allow For Flexible seal Mating surfaces must be flat O Ring seal only Closing plate made from alloy 22 INSTALLATION MANUAL RETRACT R 600...

Страница 23: ...of travel stop DATE DATE POWER PART NO REVISION 3RD ANGLE PROJECTION Locking sequence 6 7 4 5 1 2 3 Hull parts Thruster parts in box Thruster parts in the yacht Mouvment Mechanical end of travel stop...

Страница 24: ...point positioning blocks are in place 1 Score the position so as to be able to re fit it in exactly the correct place 2 Take the finished and formed hull plate and place four piles of beading compound...

Страница 25: ...he reinforced hull plates to be manufactured by the shipyard and 2 The adjustable thrust pads are supplied by max power but will need adjustment to suit the thrust pads The thrust pads must be at exac...

Страница 26: ...MAX POWER DATE DRAWN CHECK DATE DATE RELEASE MATERIAL REF TITLE REVISION R600 Up Down unit diagram Max Power 03 05 01 POWER 70 bar max 26 INSTALLATION MANUAL RETRACT R 600...

Страница 27: ...ve to the retract HP thermo plastic hose 1 DBR Supply from hydraulic directional valve to the retract HP thermo plastic hose 1 RD Motor drain from retract directly to oil tank LP hose minimum LV Synth...

Страница 28: ...er This excludes any damage or faults occurring from normal wear and tear on the following items engine oil seals relay contacts If warranty is registered within the 3 month period following installat...

Отзывы: