10.3. Removing the gear box
1. Perform removal of steps 1 to 10 of " 10.2. Removing the tapping
shaft assembly ".
2. Remove one screw and the Capacitor.
3. Remove the transformer set screw, and remove the transformer
and remove the base for transformer set screw W to Y and remove
the base for transformer.
4. Remove the screw Z and Up/down detector P.C.B.
Remove the gear box screws a to d.
19
Содержание EP1015-U1
Страница 2: ...1 Components identification 1 1 Massage lounger 2...
Страница 3: ...1 2 Controller 3...
Страница 7: ...5 Actual wiring diagram 7...
Страница 10: ...Massager operation and clutch motion 8 Massager up down detection gear adjustment method 10...
Страница 15: ...15...
Страница 37: ...14 4 Instructions for trouble shooting in response to a customer s claim 37...
Страница 38: ...15 Trouble shooting 38...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...
Страница 42: ...16 Exploded view 42...
Страница 43: ...43...
Страница 44: ...44...
Страница 45: ...45...
Страница 46: ...46...
Страница 47: ...17 Replacement parts list for EP1015 U1 NOTES RMKS 1Available individually 47...