*Prior to disassemble, removal of the reclining lever and the power source switch block
required.
1.Pull out the snap pin and take out the link support pin.
2.Cut two insulated ties connecting the under cover and the right and left under pipe.
3.Cut the insulated tie as shown figure.
4.Remove nine screws fixing the under cover to the right and left under pipe.And remove two
screws from the floor guide and take out the floor guides.
5.Remove staples connecting the under cover to the blow cushion left at inside of the power
source switch block.
29
Содержание EP1015-U1
Страница 2: ...1 Components identification 1 1 Massage lounger 2...
Страница 3: ...1 2 Controller 3...
Страница 7: ...5 Actual wiring diagram 7...
Страница 10: ...Massager operation and clutch motion 8 Massager up down detection gear adjustment method 10...
Страница 15: ...15...
Страница 37: ...14 4 Instructions for trouble shooting in response to a customer s claim 37...
Страница 38: ...15 Trouble shooting 38...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...
Страница 42: ...16 Exploded view 42...
Страница 43: ...43...
Страница 44: ...44...
Страница 45: ...45...
Страница 46: ...46...
Страница 47: ...17 Replacement parts list for EP1015 U1 NOTES RMKS 1Available individually 47...