
First installation
Page 8
5
First installation
Before commissioning the CLS you must execute the following four measures:
If a hitch (basic hitch or quick-attachment hitch) is not yet mounted on your tractor,
proceed as described in section 5.1.
The CLS can also be mounted on a rear three-point linkage as described in section
6.2. Mounting instructions for a rear three-point linkage are specified in the docu-
mentation provided with your tractor or with the rear three-point linkage.
If you have selected the CLS version with chassis, then you must mount the supplied
pivot wheels and the support wheel. To do this proceed as described in the attach-
ment instructions that were provided with the chassis.
Check whether the PTO shaft is the correct length for use on your tractor. If neces-
sary adjust the length of the PTO shaft, as described in section 5.2.
Mount the suction connector and the suction hose as described in section 5.3.
5.1
Mounting the hitch
Note!
CLS-G/H 650/850 series implements are compact implements that can be
attached to a variety of tractors.
See the attachment recommendations in the current price list and note the
restrictions cited in this manual.
Note!
The CLS depends on the universal joint shaft speed of the tractor.
Maintain the work speed prescribed by the tractor manufacturer, as this is
only way to achieve optimal turbine speed.
Note!
Enter the vehicle ID number of the tractor in (page ) of this operating
manual.
5.1.1
Mounting the quick-hitch on John Deere X Series tractors
Danger!
The operator or persons near the tractor/implement can be severely injured.
Switch off the tractor engine and remove the ignition key before mounting
the towing gear.
Attention!
The tractor and the CLS can be damaged.
Only use the supplied material.
Note!
The quick-hitch is not included in the CLS scope of delivery; it must be or-
dered separately.
Note!
In the attachment instructions below the numbers specified refer to the
components as they are shown and marked in
Fig. 2.