Operation
Page 19
4
Operation
Attention!
Before starting up the implement read the instructions on safety and han-
dling for operation of the entire implement and connection to the tractor. In
addition, prior to start-up you must ensure that the vehicle meets the re-
quirements specified in the German Road Traffic Vehicle Licensing Act.
The front power lift should only be placed in service if all safety devices are
attached and fully functional. Prior to starting work the operator must famil-
iarize himself with the device and ensure for himself that the entire device is
operationally reliable.
Moving objects and fixtures, (ropes, chains, linkage, etc.) must be ade-
quately secured before transport or driving on public roads to exclude the
danger of accident or hazards to third persons.
4.1
Attachment variants of the coupling triangle
Fig 27: Coupling triangle
You can make four different settings on the coupling triangle (see Fig 27 in this regard).
Position the bolts in the appropriate bores to achieve the desired setting.
Standard
Couple the triangle in points A and C.
Standard with stronger take-up
Couple the triangle in points B and C.
Lift increased by 45 mm
Couple the triangle in points B and D.
Lift increased by 45 mm
Couple the triangle in points B and D.
D
C
B
A