10
NOTE: SALT SETTING AND CAPACITY ARE PRESET AT THE
FACTORY.
Final Check:
1. Fill the brine tank with Solar Salt.
2. Make sure the drain line connection meets all plumbing codes and
that the drain line size can handle the backwash flow rate of the
combination unit.
3. Make sure the Inlet and Outlet on bypass valve are open.
4. Make sure the control valve timer is plugged into an electrical
outlet with power 24 hours per day.
5. Check all piping for leaks.
Note: Do not use any iron cleaning treatments, such as Res-Up
or Iron Out, with these units.
IMPORTANT NOTE:
The treated water alkalinity level will be slightly
reduced by the unit unit which decreases the pH level of the water.
You should consider installing pH control after this unit; it could be
an acid neutralizer or chemical feed system.