![Masport CLUTHA Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/masport/clutha/clutha_installation-and-operation-manual_1735355007.webp)
7
8 Positioning
Refer to minimum clearances in the above table. Note that the testing was carried out with a ceiling
height of 2.4mtrs from the ground.
Any proposed deviation from the specified clearances or installation configurations should in accordance
with AS/NZ 2918:200
9 Flue Requirements
A minimum 4.2M long, 150mm diameter Masport flue system or flue system tested in accordance with
AS/NZS 2918:2001, Appendix F shall be used with a 900mm long Masport double skin flue shield.
NOTE
The Clutha has been tested and approved for the use of the
Masport drop Box
flue system.
It is highly recommended that the 200 inner casing of Masport flue system be extended to within
250~300mm below the top of the 250mm outer casing.
Please note that the environment may have an impact on how the flue system performs and may need
additional components added to remedy these issues, flue casings other than std height must be braced
in accordance with relevant building codes.
Flue installations other than a std vertical type are not recommended. however if an installation requires
offsets guidelines are set out with AS/NZS 2918:2001 and must be followed.
All flue pipe joints, and the flue spigot must be sealed using an appropriate fire cement, all flue pipes
must be secured using 3x 3.25mm stainless steel rivets.
Be sure that flue pipes have been sealed as this can cause issues with the draw and a lack of
performance from the heater.
10 Brick and Baffle Layout
Before the first light-up, ensure that the burner is correctly installed and signed off
by an approved installer or local council and all local council's wood fire permit
requirements have been completed satisfactorily and all components have been
fitted to the heater.
Содержание CLUTHA
Страница 16: ...16 ...