10
559802 - Masport 4/6 Burner 210 Series - May 2015
11. Loosen the 3 Screws (item b), remove the 4th & 5th screws, then assemble the heat shield (item 33) and left hand side shelf (item 16)
to the appliance with 5pcs Screw (SS) M6*12 (item b). Level the top of the table and secure.
If the timer knob is not fitted then, fit one knob (item 15) on the shaft of the timer on the side table. Refer to the timer section for correct
operating procedure.
15
Screw SS M6*12 (b)
16 (b)
33
4th & 5th
12. Loosen fully but do not remove 4 screws (item b) as shown. Remove two screws 5 & 6, lower the side table over the screw heads.
Fasten the four screws to secure the side table. Refit screws 5 & 6, screw 6 secures the facia which may require frontal pressure to
align this hole. Level the top of the table and secure.
15
Screw SS M6*12 (b)
16 (b)
33
4th & 5th
13. 1) Remove all packaging from the side burner prior to fitting the Right Hand (side Burner) table to the BBQ. Prepare the BBQ prior
to fitting the side table, refer to previous instructions. Then assemble the Side burner assembly (item 17) as described in step 13. If
the knob (item 15) has not been fitted then assemble the knob (item 15) to the valve shaft on side burner assembly (item 17), and
make sure the red point on the knob is on the upper direction.
2) Connect the side burner hose to the main manifold, and tighten carefully.
Note!
Before operating this appliance for the first
time LEAK TEST ALL JOINTS.
Содержание AMBASSADOR 80.40RBW 210
Страница 4: ...Images ...
Страница 31: ......
Страница 32: ...Head Office New Zealand 1 37 Mt Wellington Highway Panmure P O Box 14 349 Auckland 1060 New Zealand ...