Doc.Ref No.:m92E/om/101
Issue No.:09
9000C
S
AFETY AND WARNING
To ensure that the device can be operated safely and
All function can be used, please read these instructions
Carefully before installing the device.
Caution: Never carry out work when the Power is
turned ON, this is dangerous.
Installation and startup must be carried out by
qualified person only. The relevant country-Specific
regulations (e.g., VDE, DIN) must also be observed.
Before startup it is particularly important to ensure:
•
Terminal wiring:
Check that all cables are connected According to
the connection diagram.
•
The Power supply has been connected correctly
•
Protection is provided against electric shock.
•
The device can be switched off outside the power
Supply according to EN 60950 regulations.
(e.g., by the line protection on the primary side)
•
All supply lines should have sufficient fuse
protection and are of correct size.
•
All output cables are of correct size for the
maximum device output current or have separate
fuse protection.
•
Sufficient convection is ensured.
After installation the terminal area must be covered
to provide sufficient protection against unauthorized
Access to live parts.
This is ensured by installing the device in the
control Cabinet or distributor box.
C
ONNECTION
Connection details:
Block Diagram and connection details of SOP
Note: In case of DC supply connect DC (+) to terminal no.
3 and DC (-) to terminal no. 4.
Block Diagram and connection details of DOP
Block Diagram and connection details SOP HART
Pass Suitable for 2 wire transmitter only
Block Diagram and connection details of DOP HART
Pass Suitable for 2 wire transmitter only
Note: In case of DC supply connect DC(+) to terminal
no. 4 and DC(-) to terminal no. 5.
I
NSTALLATION
Din Rail Mounting:
The unit can be snapped onto all DIN rails (35
mm) According to EN60715. The device must be
mounted horizontally (Output terminal blocks
facing upper wards).