 Charge Regulator 

Installation and Operation

Eleven Step Quick Start Guide

The sequence of connection is critical to the voltage set up of the HRD

i

. Follow these instructions

carefully to ensure no connections are live during installatioin.  See Fig 2 for guidance.

1. 

Select a covered dry vertical wall location in a ventilated area close to the batteries. Using the four

screw holes in the casing, firmly attach the HRD

i

 with the wiring block downmost. At this stage we

recommend that the external temperature sensor be inserted into its dedicated port so that the sensor
is in the viscinity of the batteries.

2. 

Select cables and connectors that will continuously carry a 

minimum

 of 10 Amps.  No less than

4.0 mm² gauge cable should be used to provide the link from the HRD

i

 to the battery.

3.

 

Cut the minimum cable necessary to link the HRD

i

 to the battery, thus avoiding voltage drop and

ensuring accurate voltage sensing.  The maximum recommended length is 1.5m.

4. 

Caution. Before any connections to the HRD

i

 are made, cover any solar panels and restrain the

Windcharger from turning. Ensure that any other charge sources to the battery are stopped.

5. 

Set the HRD

i

 Charge / Stop switch to the Stop position.

6. 

Connect the battery link cables to the HRD

i

 battery positions, BAT1+ & BAT1-  and if a second

bank is used, BAT2+ & BAT2-.  It is ESSENTIAL that  BAT1 is connected as this link provides
internal power for the HRDi. Connect BAT2 before BAT1 if both are to be used.

7. 

Connect the 2 Windcharger cables to the Windcharger positions ( WG + & WG - ) and the solar

panel cables to the solar panel positions ( PV + & PV - ) ensuring correct polarity is observed.
Note : Solar panels must be fitted with appropriate blocking diodes , parallel panels having one
each.  Keep the solar panels covered and Windcharger tied.

8. 

Connect the other ends of the battery link cables to the battery terminals, ( + & - ) ensuring

correct polarity.  This senses the battery voltage and establishes 12V or 24V operation. The LCD
screen and buttons will now illuminate. Do not press any buttons.

9. 

The screen shows a brief introduction screen, then a status report that  must be checked as

corresponding to the set up as shown below:

10.  Press 

Continue 

(back light button) 

>

 or wait for 10 seconds for the operating screen to display.

11. 

Move the Charge / Stop switch to the Charge position, uncover any solar panels and untether the
Rutland Windcharger.  The system is now fully operational and will begin to monitor & log.

System Voltage 12 V

Batter y 2 Connected

Exter nal Temp

Other option = 

24 V

Other option = 

Not Fitted

Other option =

 Internal

Note : With the shutdown switch still in
the stop position wires may be
disconnected in order to start again
should the settings not be as required.

Содержание HRDi

Страница 1: ...HRDi Charge Regulator Installation and Operation RUTLAND HRDi CHARGE REGULATOR INSTALLATION AND OPERATION ...

Страница 2: ... input must be de rated Contact your dealer or the manufacturer for advice May be connected in parallel with other charge sources not through the HRDi For use with a single or dual battery bank Clear alpha numeric digital LCD screen with user display options Push button activated and timer controlled backlight Accepts up to 6 mm2 cable SWG 11 or AWG 9 Optional remote display can be added to dedica...

Страница 3: ...attery positions BAT1 BAT1 and if a second bank is used BAT2 BAT2 It is ESSENTIAL that BAT1 is connected as this link provides internal power for the HRDi Connect BAT2 before BAT1 if both are to be used 7 Connect the 2 Windcharger cables to the Windcharger positions WG WG and the solar panel cables to the solar panel positions PV PV ensuring correct polarity is observed Note Solar panels must be f...

Страница 4: ...d Low will alternate Multistage Charge Mode Either with the voltage reading for values below 11 0 V 25 C Charging Mode Either Charge Current may be flowing into the battery bank s Charge Reg Regulation has begun but some current may still flow into battery bank s Reg No current is flowing to the battery bank s as the mode has shifted to Regulation and the Windcharger will run very slowly Bulk Bulk...

Страница 5: ...ory Setting Default is YES Toggle to NO and press OK to save the changes made Or Press OK and factory settings are restored Note At any time in reprogramming procedure if no button is pressed for 30 seconds then normal operation is returned without any changes being saved It is not recommended that this value be changed for all lead acid batteries Temperature compensation adjusts charging level to...

Страница 6: ...advice 8 Always fit an appropriate blocking diode to each solar panel input 9 Never connect the HRDi to the battery or any charge sources in reverse polarity 10 Avoid exceeding the recommended wiring distance between HRDi and battery Longer distances require heavier gauge cable or charging efficacy will be affected 11 Never obstruct the ventilation slots of the HRDi Please take note of these steps...

Страница 7: ...me WG Windcharger HRDi Charge Regulator PV Solar Module Max 160 W BLOCKING DIODE MUST BE FITTED Battery 1 WG WG PV PV BAT BAT BAT2 BAT2 Cut Away of HRDi Wiring Block Wiring block Parallel panels each require a blocking diode Battery 2 In Line Fuse Supplied With Windcharger ...

Страница 8: ...egulator Installation and Operation Sunshine Solar Limited Unit 30 Ashwellthorpe Industrial Estate Ashwellthorpe Norwich Norfolk NR16 1ER Tel 44 0 1508 488 188 Email sales sunshinesolar co uk www sunshinesolar co uk ...

Отзывы: