Marlec HRDi Скачать руководство пользователя страница 2

HRD

i

 Charge Regulator 

Installation and Operation

Introduction

Congratulations and thank you for purchasing the HRD

 Charge Regulator.

This is the latest technology for charge regulation of small Rutland wind turbines and solar panels.

Summary of Features & Uses

 

Protects batteries from overcharging.

 

Protects electronic equipment from high battery voltage damage.

 

Automatic 12 Volt or 24 Volt setting.

 

Temperature compensation for optimum charge regime with internal and external sensor.

 

Multi stage charging for optimum charge regime.

 

Built in charge / stop switch for installation & maintenance.

 

For use 

ONLY

 with Rutland 503, 504, 504-e, 913, 914i and FM-910-3 Windchargers.

 

Input for up to 160Watts of solar panels.

 Note : in ambient temperatures >40°C the solar panel

input must be de-rated. Contact your dealer or the manufacturer for advice.

 

May be connected in parallel with other charge sources (not through the HRDi)

 

For use with a single or dual battery bank.

 

Clear alpha-numeric digital LCD screen with user display options.

 

Push button activated and timer controlled backlight.

 

Accepts up to 6 mm

 cable ( SWG 11 or AWG 9 ).

 

Optional remote display can be added to dedicated port.

 

Operating temperature: -10°C to + 40°C  (LCD 0°C to + 40°C )

LCD screen
displaying
monitored data

Scroll button
*

Charge / Stop Switch shown in
stop position as used for
installation / maintenance.

W

iring block for inputs from Windcharger

and solar panels and output to battery banks.

Wall mounting
fixing holes.

Ventilation
slots that must
never be
obstructed.

HRD

i

 Layout & Main Features

Ports for optional
remote display (left)
and supplied external
temperature sensor
(right)

Zero button
*

Back-light button
*

* Please note
that these
buttons also
have further
functions

Содержание HRDi

Страница 1: ...HRDi Charge Regulator Installation and Operation RUTLAND HRDi CHARGE REGULATOR INSTALLATION AND OPERATION ...

Страница 2: ... input must be de rated Contact your dealer or the manufacturer for advice May be connected in parallel with other charge sources not through the HRDi For use with a single or dual battery bank Clear alpha numeric digital LCD screen with user display options Push button activated and timer controlled backlight Accepts up to 6 mm2 cable SWG 11 or AWG 9 Optional remote display can be added to dedica...

Страница 3: ...attery positions BAT1 BAT1 and if a second bank is used BAT2 BAT2 It is ESSENTIAL that BAT1 is connected as this link provides internal power for the HRDi Connect BAT2 before BAT1 if both are to be used 7 Connect the 2 Windcharger cables to the Windcharger positions WG WG and the solar panel cables to the solar panel positions PV PV ensuring correct polarity is observed Note Solar panels must be f...

Страница 4: ...d Low will alternate Multistage Charge Mode Either with the voltage reading for values below 11 0 V 25 C Charging Mode Either Charge Current may be flowing into the battery bank s Charge Reg Regulation has begun but some current may still flow into battery bank s Reg No current is flowing to the battery bank s as the mode has shifted to Regulation and the Windcharger will run very slowly Bulk Bulk...

Страница 5: ...ory Setting Default is YES Toggle to NO and press OK to save the changes made Or Press OK and factory settings are restored Note At any time in reprogramming procedure if no button is pressed for 30 seconds then normal operation is returned without any changes being saved It is not recommended that this value be changed for all lead acid batteries Temperature compensation adjusts charging level to...

Страница 6: ...advice 8 Always fit an appropriate blocking diode to each solar panel input 9 Never connect the HRDi to the battery or any charge sources in reverse polarity 10 Avoid exceeding the recommended wiring distance between HRDi and battery Longer distances require heavier gauge cable or charging efficacy will be affected 11 Never obstruct the ventilation slots of the HRDi Please take note of these steps...

Страница 7: ...me WG Windcharger HRDi Charge Regulator PV Solar Module Max 160 W BLOCKING DIODE MUST BE FITTED Battery 1 WG WG PV PV BAT BAT BAT2 BAT2 Cut Away of HRDi Wiring Block Wiring block Parallel panels each require a blocking diode Battery 2 In Line Fuse Supplied With Windcharger ...

Страница 8: ...egulator Installation and Operation Sunshine Solar Limited Unit 30 Ashwellthorpe Industrial Estate Ashwellthorpe Norwich Norfolk NR16 1ER Tel 44 0 1508 488 188 Email sales sunshinesolar co uk www sunshinesolar co uk ...

Отзывы: