![Maritime G6100 Скачать руководство пользователя страница 92](http://html1.mh-extra.com/html/maritime/g6100/g6100_operation-manual_1727424092.webp)
Appendix
Page
92
of
110
MI6100-0002
System Type
Water Monitoring System
MI6100-0002
Task:
Turbidity Light Source Replacement
Task
description:
This instruction identifies the location and replacement of the Turbidity
Sensor Light Source. Light Source replacement must be carried out by a
trained technician.
Difficulty 1-5
Overhaul Interval
Estimated Time Consumption
Every 5th year
10 min
Spare Parts
Tools
Part no:
Description:
Qty.
Item:
02385
Light Source
1
None
Instructions
Steps
1.Turn OFF the turbidity sensor by switching OFF
all automatic fuses.
2.Loosen the black end cover on the emitter (A)
3.Disconnect the emitter light source connector
(B) from receptacle J2 on the print.
4.Gently squeeze the retaining tabs (C) together
and pull to withdraw the light source (D) from its
housing (E).
5.Carefully remove the replacement light source
from its packaging – be careful not to touch the
light bulb itself.
6.Insert replacement light source (D) into the
housing (E). Ensure the tab on the light source (F)
enters the slot in the housing. Press until the light
source clicks into place.
7.Connect the light source connector (B) to
receptacle J2 on the print – make sure the
connector tap is orientated correctly
8.Ensure that the end cap O-rings (G) are
undamaged and in correct position.
9.Refit end caps on emitter and receiver.
10.Now a calibration procedure must be
performed – please follow the calibration
instructions in the operation manual.
Photos:
Notes: