![Maritime G6100 Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/maritime/g6100/g6100_operation-manual_1727424108.webp)
Appendix
Page
108
of
110
B. Assembly of the new Pump
7.
Lift the new pump & ensure below
fitting
connect
in
T-piece
connection approx. 4 mm from
hose end to bottom of the fitting -
Illustration 6 & 7.
8.
Install 1 bolt in the pump, wait to
fasten it until step 11 is done -
illustration 6.
9.
Adapt the PTFE tube 12/10 mm
before
mounting.
It
is
recommended that PTFE tube
must be
min 4 mm
deep in the
fitting - illustration 7.
10.
Mount the below Fitting Union.
Attention:
It is important to hold
the tube and fitting straight - no
twisting, while fasten fitting -
illustration 8.
Mount the Fitting Union (T piece)
- Illustration 9.
11.
Screw 1 left bolt & 1 right bolt in
the Strainer - illustration 9.
12.
Install other 3 bolts in the pump &
fasten them all.
13.
Connect Pump wires - according
to wiring diagram - illustration 10.
The replacement of the Pump Type
B version 2 is done.
14.
For instruction of pump starts up,
refer to section
5.4, 8.1.3 & 9.4
in
this manual.
Illustration 6 Illustration 7
Illustration 8 Illustration 9
Illustration 10
Notes: