GENERAL MAINTENANCE SCHEDULE
Item
Interval
Procedure
Air Filter
6 months
Inspect for dirt. Replace if necessary.
Contactor
1 year
Inspect for pitted or burned points. Replace if necessary.
Condensate Drain
1 year
Inspect for clogs. Remove and clean if necessary.
Heat exchanger
As required*
Clean as per HEAT EXHCANGER FLUSING PROCEDURE below.
*Generally not required for closed loop systems. Whenever system performance is reduced for open loop.
COAXIAL HEAT EXCHANGER FLUSHING PROCEDURE—GROUNDWATER
STEP 1
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
STEP 2
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
STEP 3
If a purge cart is not available, use a 5 gallon plastic bucket, a circulator and some plastic piping to create a
makeshift pump system. Connect a the inlet and outlet to the heat exchanger ports.*
STEP 4
Place 2 gallons of RYDLYME in the purge cart (or bucket). Circulate the fluid through the heat exchanger
for at least 2 hours (3 recommended).
STEP 5
Disconnect the purge system dispose of the solution. RYDLYME is non-toxic and biodegradable and as
such can be poured down a drain.
*
Depending on the plumbing, there should be either unions or boiler drains for to access the heat exchanger.
STEP 6
Connect fresh water and a drain to the heat exchanger ports and flush the exchanger for several minutes.
STEP 7
Return the plumbing to its original configuration and open the IN and OUT valves. Operate the system and
check for improved performance.
COAXIAL HEAT EXCHANGER FLUSHING PROCEDURE—GROUND LOOP
STEP 1
Isolate the heat exchanger by placing the pump module valves in the exchanger flushing position.
STEP 2
Connect a compressed air and a drain pipe to the pump module purge ports and blow the anti-freeze solu-
tion into a clean 5 gallon bucket.
STEP 3
Connect a purge cart to the pump module purge ports.
STEP 4
Place 2 gallons of RYDLYME in the purge cart. Circulate the fluid through the heat exchanger for at least 2
hours (3 recommended).
STEP 5
Disconnect the purge cart and dispose of the solution. RYDLYME is non-toxic and biodegradable and as
such can be poured down a drain. Clean the purge cart thoroughly.
*
Depending on the plumbing, there should be either unions or boiler drains for to access the heat exchanger.
STEP 6
Connect fresh water and a drain to the pump module purge ports and flush the exchanger for several
minutes.
STEP 7
Blow the heat exchanger out with compressed air as per STEP 2 and dump the water down a drain.
STEP 8
Connect the purge cart to the pump module purge ports. Re-fill and purge the heat exchanger with as per
standard procedures (the anti-freeze from STEP 2 can be re-used).
STEP 9
Disconnect the purge cart and set the pump module valves back to the original positions.
STEP 10
Operate the system and check for improved performance.
General Maintenance
Содержание TF-45
Страница 12: ...Page 12 001223MAN 05 1 Jul 2017 ...
Страница 13: ...1 Jul 2017 Page 13 001223MAN 05 ...
Страница 14: ...Page 14 001223MAN 05 1 Jul 2017 ...
Страница 15: ...1 Jul 2017 Page 15 001223MAN 05 ...
Страница 16: ...Page 16 001223MAN 05 1 Jul 2017 ...
Страница 19: ...1 Jul 2017 Page 19 001223MAN 05 ...
Страница 20: ...Page 20 001223MAN 05 1 Jul 2017 ...
Страница 23: ...1 Jul 2017 Page 23 001223MAN 05 ...
Страница 24: ...Page 24 001223MAN 05 1 Jul 2017 ...
Страница 25: ...1 Jul 2017 Page 25 001223MAN 05 ...
Страница 26: ...Page 26 001223MAN 05 1 Jul 2017 ...
Страница 27: ...1 Jul 2017 Page 27 001223MAN 05 ...
Страница 30: ...Page 30 001223MAN 05 1 Jul 2017 ...
Страница 31: ...1 Jul 2017 Page 31 001223MAN 05 ...
Страница 32: ...Page 32 001223MAN 05 1 Jul 2017 ...
Страница 33: ...1 Jul 2017 Page 33 001223MAN 05 ...
Страница 34: ...Page 34 001223MAN 05 1 Jul 2017 ...
Страница 38: ...Page 38 001223MAN 05 1 Jul 2017 ...
Страница 39: ...1 Jul 2017 Page 39 001223MAN 05 ...
Страница 40: ...Page 40 001223MAN 05 1 Jul 2017 ...
Страница 74: ...Page 74 001223MAN 05 1 Jul 2017 Wiring Diagram 208 230 1 60 ...
Страница 75: ...1 Jul 2017 Page 75 001223MAN 05 Electrical Box Layout 208 230 1 60 ...
Страница 76: ...Page 76 001223MAN 05 1 Jul 2017 Wiring Diagram 208 3 60 ...
Страница 77: ...1 Jul 2017 Page 77 001223MAN 05 Electrical Box Layout 208 3 60 ...
Страница 78: ...Page 78 001223MAN 05 1 Jul 2017 Wiring Diagram 460 3 60 ...
Страница 79: ...1 Jul 2017 Page 79 001223MAN 05 Electrical Box Layout 460 3 60 ...
Страница 80: ...Page 80 001223MAN 05 1 Jul 2017 Wiring Diagram 220 1 50 ...
Страница 81: ...1 Jul 2017 Page 81 001223MAN 05 Electrical Box Layout 220 1 50 ...
Страница 82: ...Page 82 001223MAN 05 1 Jul 2017 ...
Страница 83: ...1 Jul 2017 Page 83 001223MAN 05 ...
Страница 84: ...Page 84 001223MAN 05 1 Jul 2017 ...
Страница 85: ...1 Jul 2017 Page 85 001223MAN 05 Dimensions TF 45 Left Return ...
Страница 86: ...Page 86 001223MAN 05 1 Jul 2017 Dimensions TF 45 Right Return ...
Страница 87: ...1 Jul 2017 Page 87 001223MAN 05 Dimensions TF 55 65 75 80 Left Return ...
Страница 88: ...Page 88 001223MAN 05 1 Jul 2017 Dimensions TF 55 65 75 80 Right Return ...