Blastmaster
®
Smart Box
11
Total Production Timer:
1) When Abrasive Blasting Pot is pressurized the red “PRESSURIZED” LED (4) is lit.
2) While Abrasive Blasting Pot is pressurized “TOTAL TIME PRESSURIZED” Timer (2) will
activate and the red “PRESSURIZED” LED (4) will remain lit.
3) Verify timers are active. An hour glass is displayed in the top left corner to indicate they
are counting.
Daily Production Timers:
1) When Abrasive Blasting Pot is pressurized the red “PRESSURIZED” LED (4) will be lit.
2) Once an outlet has been activated by an operator the correlating “DAILY
PRODUCTION” Timer (1) will activate and the blue “ACTIVE” LED (3) will be lit.
3) Verify timers are active. An hour glass is displayed in the top left corner to indicate they
are counting.
Note: The timers count in increments of 6 minutes:
0.1
=
6
minutes
0.5
=
30
minutes
1.0
=
1
hour
OPERATING INSTRUCTIONS
Blastmaster
®
Smart
Box
™
Pressure Indicator
light does not portray
operating state of the
abrasive blasting pot.
Always depressurize
abrasive blasting pot per
instructions in abrasive
blast pot operators
manual. Failure to
comply with the above
warning could result in
death or serious injury.
W-593
Always depressurize
the entire system,
disconnect all power
sources and lockout/
tagout all components
before any maintenance
or troubleshooting is
attempted. Failure to
comply with the above
warning could cause
electrical shock and
inadvertent activation of
equipment resulting in
death or serious injury.
W-562
3
2
4
Production Timers
1