Marchetti OLYMPO Скачать руководство пользователя страница 13

IT

13

To continue assembly of the tower, at this 
point, at least one of the operators responsible 
for assembly should wear a safety harness 
and climb on the next work platform from 
inside the tower through the specific trapdoor; 
gradually, as the assembly operations proceed 
of the tower, you should take care to position 
the scaffolding in such a position to guarantee 
the operator present at a height moves in an 
agile and safe manner and has the possibility of 
easily fastening the safety harness worn; once 
assembly is complete of the tower, the work 
platform should be positioned according to 
instructions, at the desired heights, including 
the toeboards and the side guards, locating 
the two side protection battens correctly, i.e. 
positioning the batten with a 50x22 profile over 
the 4

th

 rung and the batten with the 97x25 profile 

over the 2

nd

 rung compared to the work platform 

and taking care to fasten the hooks placed on the 
ends of the upright on the frame.

6.4  Dismantling instructions

Dismantling of the towers must take place by executing the necessary operations in the inverse 
order to those for assembly; the elements composing the towers must be lowered from above 
using ropes or other suitable devices, avoiding sudden impact with the ground.

7 STABILITY

a)  The mobile access towers must be assembled and used only in the absence of wind;
b)  the stabilizer braces must always be applied, based on the configuration and the height to 

reach, as indicated; 

c)  the maximum applicable horizontal load, for example by effect of the work in progress 

on an adjacent structure, is 25 kg, intended as the total of the loads applied by various 
operators on the scaffolding;

d)  mobile access towers left unsupervised due to temporary suspension of works or due to 

the presence of wind, must be firmly fastened to a fixed, stable structure; 

e)  no additional structures must be added at the top of the tower and no screens of any 

nature, such as timber frames, coverings or otherwise, should be mounted.

8 USE

8.1  Preliminary controls

a)  Check the mobile access tower was assembled in a vertical position, regularly and 

completely following the supplier’s instructions to guarantee state of the the art 
implementation;

b)  check no environmental changes can influence safe use of the access tower (frost, rain, 

wind, ...).

Содержание OLYMPO

Страница 1: ...means working in compliance with the provisions of the current standard on health and safety in the workplace Leg Decree 09 04 2008 no 81 Code 11115 CUSTOMER ASSISTANCE DOCUMENT N 120 REV 2 DATED 08...

Страница 2: ...ow the instructions as indicated Before any installation verify the integrity of each individual component Do not use damaged or not whole components The mobile access tower is made according to the s...

Страница 3: ...TOWER DESIGN pag 8 CONFIGURATIONS UNI EN 1004 pag 9 6 ASSEMBLY AND DISMANTLING pag 10 6 1 General information pag 10 6 2 Preliminary tests pag 10 6 3 Assembly instructions pag 10 6 4 Dismantling instr...

Страница 4: ...G no 235 on 08 10 05 Ordinary Supplement no 162 Consumers Code 2 DESIGNATION CLASS CAPACITY OLYMPO working tower EN 1004 3 5 5 XXCD manufactured in compliance with Leg Decree 81 08 and Technical Stan...

Страница 5: ...prototype which has surpassed rigidity testing pursuant to Appendix A of the Technical Standard EN 1004 2005 and that it was subject with a positive outcome with the ASSESSMENT as outlined in point 1...

Страница 6: ...4 2 Maximum heights of the configuration EN 1004 The maximum height of the work platform without using the stabilizer braces is 1 60 metres maximum tower height 2 90 metres The maximum height of the...

Страница 7: ...1093 Short toeboards 75 0 75 2 2 2 6 11092 Long toeboards 180 3 00 2 2 2 21324 Guardrail 7 33803 Single parapet 2 00 2 2 2 20770 Stabilizer braces 8 20765 Stabilizer brace 35 Normal 9 80 0 4 4 9 31377...

Страница 8: ...8 www marchetti eu OLYMPO TOWER DESIGN BASE TOWER FINAL TOWER GUARDRAIL WORK PLATFORM STABILIZERS BRACES 14 3 2 2 12 11 10 4 13 1 8 9 7 5 6 9...

Страница 9: ...H Tower 2 00 H Working 0 80 A1T H Tower 2 90 H Working 1 60 A2 H Tower 3 70 H Working 2 40 A2T H Tower 4 60 H Working 3 30 A3 H Tower 5 40 H Working 4 10 A3T H Tower 6 20 H Working 5 00 CONFIGURATIONS...

Страница 10: ...embly operations can only start in the absence of wind d all the elements must be checked accessory tools and safety equipment to assemble the tower are available on site e The verticality of the mobi...

Страница 11: ...mentsofthescaffolding on the fourth rung from the bottom of the first two side frames firstly position the 2 long toeboards parallel to the treadable surface then the 2 short toeboards fitting them in...

Страница 12: ...he joint on the riser of the tower at a height to fit the upper vertical part of the brace Repeat the operation with a second joint in the same riser distancing it adequately from the first to fit the...

Страница 13: ...g the necessary operations in the inverse order to those for assembly the elements composing the towers must be lowered from above using ropes or other suitable devices avoiding sudden impact with the...

Страница 14: ...re a the mobile access towers can only be moved manually on compact smooth surfaces free of obstacles perfectly level and in the absence of wind b before moving lift the adjustable feet off the ground...

Страница 15: ...ore use Strictly complying with this manual means operating in accordance with the provisions of existing legislation on health and safety at work Legislative Decree 09 04 2008 no 81 Instructions for...

Страница 16: ...Leg Decree 81 08 but not with UNI EN 1004 they must have the base wheels braked during use and positioned on an already perfectly level floor and have stabiliser feet when present removed to the maxim...

Страница 17: ...ope anchored on top of the last upright of the last side support frame and under the wheel support block of the base section The fall proof device the safety harness and the holding rope must be certi...

Страница 18: ...welding Lubrication of tightening screws Lubrication of pins and sleeves Efficiency of wheels and braking devices Integrity of work platforms Integrity of railings Integrity of toe boards Integrity of...

Отзывы: