13
•
well-ventilated, to prevent the MAP Pilot from overheating (operating temperature >65
◦
C).
•
easily accessible for the routing of power connections and cables.
•
installed away from vibrations.
Installing the MAP MFD
The MAP MFD can be installed on the console of your USV, along with the control interfaces for other
equipment on your vessel. Please refer to Sec. 3.1 on page 12 to see an example of the location and
position of the MAP MFD. The dimensions of the MAP MFD are illustrated below:
Fig. 16: Dimensions of the MAP MFD
The mounting template of the MAP MFD is available in Appendix B.
Содержание MAP Pilot
Страница 35: ...34 Appendix A MAP Pilot Specifications ...