
DEGASSING SYSTEM DG-50
INSTALLATION OPERATION & MAINTENANCE MANUAL
MA-DG-50r01
14
CAUTION
:
BEFORE TO START-UP THE SYSTEM, IT MUST BE VERIFIED THAT THERE IS SAMPLE
FLOW, FLOWING AT THE SAMPLE OUTLET. IF NOT, HEATER MAY BE DAMAGED BY INTERNAL
OVERHEATING.
•
Switch on the circuit breaker (Q1) inside the electrical box to start up the equipment and close
the electrical box.
•
Then, in order to energize heater and temperature controller, interrupter in electric box cover
must be switched on.
•
In normal conditions, after circuit breaker is activated, and interrupter in electric box cover is
switched on, heater and temperature controller, both will be energized.
Circuit breaker
•
In case of cold starting wait at least half an hour until temperature gets stabilized for getting
accurate measurements.
Temperature controller parameters (with exception of temperature set point) are workshop adjusted and
usually, it won´t be necessary to modify it, but if required, this operation is described in chapter 7
(Programming).