
DEGASSING SYSTEM DG-50
INSTALLATION OPERATION & MAINTENANCE MANUAL
MA-DG-50r01
11
Sample inlet and outlet connections
•
It is advisable, the use of corrosion resistant pipework, suitable for the fluid being sampled, in
order to connect degasser system, to sampling stream.
•
Keep the length of tubing to a minimum. Only 80 mm of straight tube, must be respected from
connection fitting (¼” NPTF), to the previous curve upstream.
•
Connect sample IN, in the left upper side connections of the degasser system by using ¼” NPTM
fitting to ¼ NPTF connector. Connection is labelled with the indication “SAMPLE IN”.
•
Connect sample OUT, in the left upper side connections of the degasser system by using ¼”
NPTM fitting to ¼ NPTF connector. Connection is labelled with the indication “SAMPLE OUT”.
Sample inlet and outlet connections
Drain connections
All possible effluents produced by the degassing system, are directed to a funnel in the lower part of the
panel. Therefore, there is an only drain connection in the system. The drain pipe, must be connected to the
½” NPTM threaded connection, in the lower part of the funnel.
Drain pipe length must be as short as possible, and minimum size ½” in order to avoid backpressure.
Furthermore, funnel must be higher than any other point in drain pipe path and drain point, must be at
atmospheric pressure.
Drain connection