Mantech L100 PeCOD Скачать руководство пользователя страница 10

 

 
 
 

10 

Ensure you prepare sufficient  amounts of each solution, taking into account  the  volume required for priming 
(~2mL per prime), calibration and sample analysis. It is recommended to prepare a total minimum volume of 
20mL for each sample, and 250mL and 500mL of pre-mixed calibrant and blank, respectively.

 

4.4 Priming of Lines

 

Always prime both Port A and Port B lines 3 times before any analysis to ensure that both lines are filled with 
liquid  and  there  are  no  air  bubbles  present.  This  can  be  confirmed  by  visually  checking  all  flow  lines.  For 
automated system, 6 primes of Port A are required to accommodate the longer sampling line.

 

 

To prime the lines manually from the touchpad:

 

1.

 

Press 

MENU

.

 

2.

 

Arrow down to select 

Operation

 and press 

ENTER

.  

 

3.

 

In the Operation menu, select 

Prime Lines

 and press 

ENTER

 

4.

 

In the Prime Lines menu, select 

Prime Port A

 and press 

ENTER

. The solution will flow in through the 

tube connected into Port A and flow out through the tube connected to Port W. The analyzer will beep 
twice at the end. Repeat two more times.

 

 

5.

 

In the Prime Lines menu, arrow down to select 

Prime Port B

 and press 

ENTER

 

The solution will flow in through the tube connected into Port B and flow out through the tube 
connected to Port W. The analyser will beep twice at the end. Repeat two more times.

 

4.5 New Sensor Routine and Calibration

 

Important Note:

 It is recommended that the system be calibrated a minimum of two times each day it is in use 

to ensure that the sensor is fully conditioned before running samples. The “New Sensor Routine” can be used to 
speed up the process of “breaking-in” a new sensor.

 

 

To run a new sensor routine manually from the touchpad:

 

1.

 

Press 

MENU

.

 

2.

 

Arrow down to select 

Set up

 and press 

ENTER

.

 

3.

 

In the Set up menu, arrow down to select 

Sensor Operation

 and press 

ENTER

.

 

4.

 

Select 

New Sensor

 and press 

ENTER

.

 

 

5.

 

At the prompt “Confirm new sensor?”, press 

ENTER

. The PeCOD® will now begin the new sensor 

routine, which comprises of a normalization and burn-in phase of Port B.

 

 

6.

 

After 2.5 minutes, the analyzer will beep and ask the user to verify the COD range. Press 

ENTER

 to 

confirm the range. The PeCOD® will now do a full calibration.

 

 

7.

 

Partway through the calibration, the system will beep again. Press 

ENTER

 to continue.

 

Содержание L100 PeCOD

Страница 1: ...1 L100 PeCOD COD ANALYZER Operation Manual...

Страница 2: ...the Analyzer On 9 4 3 Preparation of Solutions 9 4 4 Priming of Lines 10 4 5 New Sensor Routine and Calibration 10 4 6 PeCOD Menu Structure 11 4 7 Running a Sample 15 4 8 Other Operational Functions 1...

Страница 3: ...ed only by properly qualified and trained personnel 1 2 Theory of Operation Mechanism Photocatalytic Oxidation The PeCOD L100 analyzer employs a unique patented technology that can directly measure ph...

Страница 4: ...t source UV LED MDL determined for Advanced Blue range GENERAL SPECIFICATIONS Construction ABS Dimensions approximate L x W x H 370mm x 230mm x 240mm Weight 5 kg Security 4 digit pin optional Paramete...

Страница 5: ...ents Failure to do so could result in damage to the equipment To ensure that the protection provided by this equipment is not impaired do not use or install this equipment in any manner other than tha...

Страница 6: ...COD in natural and wastewater samples in laboratory and field analyses It is fast a typical analysis takes less than 15 minutes sensitive detection limit at 0 7 ppm level in Advanced Blue range envir...

Страница 7: ...ribed in this section of the manual 3 1 Unpacking the Instrument Please refer to the standard packing list included with your L100 for a complete list of L100 accessories and items If any of these ite...

Страница 8: ...ions Plug the power supply into the appropriate connector on the back panel of the analyzer then plug the power cord into a power outlet 100 240 V 45 60 Hz Touch the red power key on the top right of...

Страница 9: ...ns should also be prepared using the same dilution factor as was used for the sample The following table lists the four COD ranges available and their corresponding dilution factors COD Range ppm Dilu...

Страница 10: ...nd Repeat two more times 5 In the Prime Lines menu arrow down to select Prime Port B and press ENTER The solution will flow in through the tube connected into Port B and flow out through the tube conn...

Страница 11: ...on Pressing the left arrow button will display the C value Verify that the M and C values are within the recommended ranges prior to running samples see box below Note that M and C values vary from se...

Страница 12: ...OD fluidics are sealed Run Sample Commences operation of the analyser Run Calibration Commences the calibration routine Run Standby Commences standby operation which primes Port B using a repeat cycle...

Страница 13: ...once then analyse calibration solution once Record values for C and M to be used for future determinations Valid values are 1 2 or 3 Use the Up Down arrow touch keys to change value Pulse Settings Se...

Страница 14: ...p Down arrow keys to set date time Display Units COD Units COD units Choice of ppm or mg L Use the Up Down arrow touch keys to choose display units Equiv BOD Units BOD Factor If set to Zero then no BO...

Страница 15: ...D value The instrument is measuring the charge liberated from the oxidation reactions To run a sample manually from the touchpad 1 Press RUN 2 The analyzer will beep Check that the flow line from Port...

Страница 16: ...d press ENTER 5 Use the Up Down Left and Right arrow touch keys to set the value for standby interval time in hours minutes format 6 Press ENTER To run Standby manually from the touchpad 1 Press MENU...

Страница 17: ...cs menu arrow down to select Set PIN Number and press ENTER 4 Use the Up and Down arrow touch keys to set the value Note Default value is set to 0000 and security is disabled Erase Logs To erase logs...

Страница 18: ...supply The pack will provide up to 8 hours of continuous operation 5 3 System Storage General Guidelines The sensor and electrode block may be stored in the PeCOD for up to three weeks ensure that th...

Страница 19: ...for the error and suggested action to rectify the error Error Group Sub Code Name Description of Problem Suggested actions 2 1 Terminated by User The exit button on the PeCOD display was selected Err...

Страница 20: ...le 3 4 Failure Qnet Zero Resultant charge is too low i e not enough signal detected Ensure that sample is mixed with electrolyte in proper ratio and lines are primed Check electrical contacts between...

Страница 21: ...the line prime lines and then re run analysis The current and voltage applied may be too high try decreasing the set baseline and recalibrate Check electrical contacts between the connection pins on a...

Страница 22: ...ons The current and voltage applied may be too high try decreasing the set baseline and recalibrate Check electrical contacts between the connection pins on analyser board with the electrode block Ver...

Страница 23: ...ENTER 2 In the Data menu select Event Log and press ENTER The most recent event log will be displayed Each log will contain the event number an error code a brief description corresponding to that err...

Страница 24: ...w of water out of the Port A tubing and note any particles that are expelled into the waste beaker Stop pushing the plunger when you hear the pump stop 7 Repeat Step 6 a few times and ensure the flow...

Страница 25: ...ffs and insure the instruments or consumables in transit back to MANTECH or accept the risk of loss or damage during such transportation MANTECH will ship the repaired or replacement instruments or co...

Страница 26: ...bility to you or any third party and your rights against MANTECH are limited to those set out in these warranty terms and under statute 3 2 To the extent permitted by law you acknowledge and agree tha...

Страница 27: ...reached during a calibration or sample analysis Iterm the Iwork at the end of each oxidation curve as it reaches the baseline Iwork the measure of the current charge LED the LED mA is set during the f...

Отзывы: