![Manitowoc National Crane 800D Скачать руководство пользователя страница 167](http://html.mh-extra.com/html/manitowoc/national-crane-800d/national-crane-800d_operators-and-service-manual_701268167.webp)
National Crane
Published 5-27-2018 Control # 039-06
6-17
800D
REPAIR
Cable Tension Sequence
Five section boom with two stage cylinder.
Cable tensioning (See Figure 6-2) to be in the following
order:
1. 321 retract cables
2. 123 extend (synchronizing) cables.
3. 234 extend cables
4. 432 retract cables.
5. 345 extend cables
6. 543 retract cables.
Four section boom with two stage cylinder.
Cable tensioning to be in the following order:
1. 321 retract cables
2. 123 extend (synchronizing) cables.
3. 234 extend cables
4. 432 retract cables.
Four section boom with one stage cylinder.
Cable tensioning to be in the following order:
1. 123 extend cables.
2. 321 retract cables.
3. 234 extend cables.
4. 432 retract cables.
Three section boom with one stage cylinder.
Cable tensioning to be in the following order:
1. 123 extend cables.
2. 321 retract cables.
8860-5
FIGURE 6-1
8860-6
Fo
r
Reference
Only
Содержание National Crane 800D
Страница 1: ...Operator and Service Manual National Crane 800D F o r R e f e r e n c e O n l y ...
Страница 4: ...F o r R e f e r e n c e O n l y ...
Страница 98: ...MAINTENANCE 800D 3 10 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 194: ...SPECIFICATIONS 800D 8 4 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 216: ...INSTALLATION 800D 9 22 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 232: ...CRANE INSTALLATION 800D 10 16 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 252: ...SCHEMATICS 800D 2 Published 5 27 2018 Control 039 06 F o r R e f e r e n c e O n l y ...
Страница 255: ...F o r R e f e r e n c e O n l y ...
Страница 256: ...F o r R e f e r e n c e O n l y ...