Part Number Preliminary 6/11
111
Harvest Sequence
5. Water Purge
The air pump(s) (when used) and the harvest valve(s)
open at the beginning of the water purge to divert hot
refrigerant gas into the evaporator.
The water pump(s) continues to run, and the water
dump valve energizes to purge the water in the water
trough.
6. Harvest
The air pump (when used) remains energized and the
harvest valve(s) remains open. The refrigerant gas
warms the evaporator causing the cubes to slide, as a
sheet, off the evaporator and into the storage bin.
Single evaporator models
- The sliding sheet of
cubes opens the water curtain/ice damper and bin
switch.
The momentary opening and re-closing of the bin
switch terminates the harvest sequence and returns
the ice machine to the freeze sequence (Step 3 - 4.)
Multiple evaporator models
- The sliding sheet of
cubes opens the ice damper and bin switch. The
momentary opening and re-closing of the bin switch
de-energized the harvest valve for the evaporator.
When all of the bin switches have opened and closed
the ice machine will terminate the harvest sequence
and return to the freeze sequence (Step 3 - 4.)
Содержание ICVD3095
Страница 2: ......
Страница 12: ...12 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 25: ...Part Number Preliminary 6 11 25 This Page Intentionally Left Blank ...
Страница 26: ...26 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 36: ...36 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 72: ...72 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 101: ...Part Number Preliminary 6 11 101 This Page Intentionally Left Blank ...
Страница 132: ...132 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 137: ...Part Number Preliminary 6 11 137 This Page Intentionally Left Blank ...
Страница 138: ...138 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 187: ...Part Number Preliminary 6 11 187 This Page Intentionally Left Blank ...
Страница 188: ...188 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 225: ...Part Number Preliminary 6 11 225 This Page Intentionally Left Blank ...
Страница 226: ...226 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 262: ...262 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 283: ...Part Number Preliminary 6 11 283 ACCESS REMOTE RECOVERY EVACUATION CONNECTIONS ...
Страница 291: ...Part Number Preliminary 6 11 291 This Page Intentionally Left Blank ...
Страница 298: ...298 Part Number Preliminary 6 11 USING PINCH OFF TOOL ...
Страница 303: ...Part Number Preliminary 6 11 303 This Page Intentionally Left Blank ...
Страница 304: ...304 Part Number Preliminary 6 11 ...
Страница 305: ...Part Number Preliminary 6 11 305 This Page Intentionally Left Blank ...
Страница 306: ...306 Part Number Preliminary 6 11 This Page Intentionally Left Blank ...
Страница 336: ...336 Part Number Preliminary 6 11 I0300 I0320 I0450 I0500 I0520 Self Contained Air Water cooled 1 Ph ...
Страница 337: ...Part Number Preliminary 6 11 337 I0500 Remote Air cooled 1Ph ...
Страница 338: ...338 Part Number Preliminary 6 11 I0600 I0850 I1000 I1200 Self Contained Air Water cooled 1 3 Ph ...
Страница 339: ...Part Number Preliminary 6 11 339 I0600 I0850 I1000 Remote Condenser Air cooled 1 3 Ph ...
Страница 340: ...340 Part Number Preliminary 6 11 I0670C I0870C I1070C I1270C QuietQube Remote Air cooled 1 3 Ph ...
Страница 341: ...Part Number Preliminary 6 11 341 IB0690C IB0890C IB1090C QuietQube Remote Air cooled 1 3 Ph ...
Страница 342: ...342 Part Number Preliminary 6 11 I1400 I1800 Self Contained Air Water cooled 1 3 Ph ...
Страница 343: ...Part Number Preliminary 6 11 343 I1400 I1800 Remote Air cooled 1 3 Ph ...
Страница 349: ......