SEDM-L - Smoke extraction damper - multi
Page 24
Version 2022-12-20
TPM 157/22
Solid wall / solid shaft wall construction - mortar or gypsum
■
Examples of anchors to the fire dividing construction
EIS 90
- damper in the wall
EIS 120
- damper in the shaft wall, which is a
part of a smoke extraction duct - multi
* This is the recommended size
1
SEDM-L
2
Solid wall construction
3
Shaft wall of a solid wall construction which is a
part of a smoke extraction duct - multi
4
British gypsum thistle bond 60 (or equivalent can
by used) minimum density 670 kg/m³
5
Flange
6
Grille
Installation in solid wall / in solid shaft wall construction
■
In case of installation damper tightly above
the floor, must be joint between damper
body and floor min. 75 mm and must be
completely filled with gypsum.
■
Each Damper must be suitably supported in
each corner front and rear with temporary
block-work, temporary steel supports or
similar, until gypsum has fully hardened.
A
≥ 1
00
A
X
A-A
X
≥
1
0
0
50*
In a shaft wall construction, which is a
part of a smoke extraction duct - multi