17
TPM 083/12
Fig.. 22
Gypsum wall construction - installation next to wall, ceiling - mortar or gypsum and mineral wool
≥
100
(
≥
100)+50
A-A
3
2
2
3
10 to 50
10
to
5
0
≤
D
+
10
0
1 2
2 1
3
D-20
≥
100
B-B
2
2
10 to 50
10
to
5
0
≤
D
+
10
0
1 2
2 1
A
A
2
1
3
D
-2
0
3
B
B
2
1
POSITION:
1
Fire damper FDMC
2
Mortar or gypsum
3
Mineral stone wool min. density 140 kg/m
3
Installation opening has to be
reinforced by profile (UW, CW).
Profil is fixed by screws
≥
3,5 mm
with corresponding length. Distance
between screws
≤
200 mm.
Installation opening has to be
reinforced by profile (UW, CW).
Profil is fixed by screws
≥
3,5 mm
with corresponding length. Distance
between screws
≤
200 mm.
EIS 60
Notice:
●
Gap between damper and construction is filled by mortar or
gypsum and mineral wool
●
Wool is fixed to damper body and construction by fire protection
mastic.
●
Mineral wool thickness = construction thi 50 mm
●
Damper axis has to be horizontal
●
Installation is valid for ceiling construction
Содержание FDMC
Страница 1: ......