
Site requirements
Chapter 2
Zetasizer APS Basic Guide
Page 2-3
Power requirements
The mains power supply must be clean and filtered. If necessary, fit an Un-inter-
ruptible Power Supply (UPS) to remove any spikes or noise. The power require-
ments are:
Power cords and Power safety
The notes in this section indicate best practice. Adhere to these when connecting
the instrument to the power supply.
Warning!
Do not operate this product with a damaged power cord set. If the power
cord set is damaged in any way, replace it immediately.
Warning!
Do not use the power cord supplied with this product on any other
products.
Power cord set requirements
Power cord sets must meet the requirements of the country where the product is
used. For more information, contact a Malvern representative.
General requirements
The following requirements apply to all countries:
The power cord must be approved by an acceptable accredited agency respon-
sible for evaluation in the country where the power cord set will be installed.
Component
Power requirement
Power sockets required
Zetasizer APS
90-260V AC, 50-60Hz,
150W
1
PTC-1000
115-230V AC, 50-60Hz,
294W
1
Computer
See manufacturer’s documentation
Computer monitor
See manufacturer’s documentation
Printer
See manufacturer’s documentation
MAN0494-1 (Zetasizer APS Basic Guide).book Page 3 Friday, August 9, 2013 2:08 PM