Provide enough space to allow easy access to all components of the system. Allow
for 2500mm (width) x 850mm (depth) of bench space. Allow at least 800mm
above the bench surface for access to the cell area.
Power requirements
The mains power supply must be clean and filtered. If necessary, fit an
Uninterruptible Power Supply (UPS) to remove any spikes or noise. The power
requirement for each component of the Spraytec system is given below.
Component
Power requirement
Power sockets
required
Spraytec
~ 100-240V, 50-60Hz
1
NSS
~ 100-240V, 50-60Hz
0
Switching box
~ 100-240V, 50-60Hz
1
Extractor
~ 100-240V, 50-60Hz
1
Computer
See manufacturer’s documentation
1
Computer monitor
See manufacturer’s documentation
1
Power cords
Power cord set requirements
Power cord sets must meet the requirements of the country where the product is
used. For further information on power cord set requirements, contact a Malvern
representative.
General requirements
The requirements listed below are applicable to all countries:
.
The power cord must be approved by an acceptable accredited agency re-
sponsible for evaluation in the country where the power cord set will be in-
stalled.
A P P E N D I X C
S
p
r
a
y
t
e
c
P a g e C . 3
Содержание Spraytec
Страница 1: ...Spraytec User Manual Spraytec User Manual M A N 0 3 6 8 I s s u e 1 0 N o v 2 0 0 5...
Страница 7: ...Part 1 Operator s guide Part 1 Operator s guide...
Страница 8: ......
Страница 9: ...Introduction to this manual Introduction to this manual C H A P T E R 1...
Страница 10: ......
Страница 16: ...C H A P T E R 1 S p r a y t e c Page 1 6 M A N 0 3 6 8...
Страница 17: ...What is the Spraytec What is the Spraytec C H A P T E R 2...
Страница 18: ......
Страница 31: ...The Spraytec hardware The Spraytec hardware C H A P T E R 3...
Страница 32: ......
Страница 42: ...C H A P T E R 3 S p r a y t e c Page 3 10 M A N 0 3 6 8...
Страница 43: ...The Spraytec software The Spraytec software C H A P T E R 4...
Страница 44: ......
Страница 63: ...Measurement tutorial Measurement tutorial C H A P T E R 5...
Страница 64: ......
Страница 99: ...Interpreting the results Interpreting the results C H A P T E R 6...
Страница 100: ......
Страница 125: ...Using measurement files Using measurement files C H A P T E R 7...
Страница 126: ......
Страница 133: ...Basic maintenance Basic maintenance C H A P T E R 8...
Страница 134: ......
Страница 139: ...Part 2 Supervisor s guide Part 2 Supervisor s guide...
Страница 140: ......
Страница 141: ...Security Security C H A P T E R 9...
Страница 142: ......
Страница 151: ...Advanced features Advanced features C H A P T E R 1 0...
Страница 152: ......
Страница 170: ...C H A P T E R 1 0 S p r a y t e c Page 10 18 M A N 0 3 6 8...
Страница 171: ...SOP management SOP management C H A P T E R 1 1...
Страница 172: ......
Страница 175: ...Part 3 Appendices Part 3 Appendices...
Страница 176: ......
Страница 177: ...Health and Safety Health and Safety A P P E N D I X A...
Страница 178: ......
Страница 184: ...A P P E N D I X A S p r a y t e c Page A 6 M A N 0 3 6 8...
Страница 185: ...Specification Specification A P P E N D I X B...
Страница 186: ......
Страница 191: ...Site requirements f r o m M A N 0 3 6 8 I s s u e 1 0 Site requirements A P P E N D I X C...
Страница 200: ...A P P E N D I X D S p r a y t e c Page D 3 M A N 0 3 6 8...
Страница 201: ...Installation Installation A P P E N D I X E...
Страница 202: ......
Страница 206: ...A P P E N D I X E S p r a y t e c Page E 4 M A N 0 3 6 8...
Страница 207: ...Regulatory statements Regulatory statements A P P E N D I X F...
Страница 208: ......
Страница 213: ...Index Index...
Страница 214: ......
Страница 221: ......