.
The
Measurement setup
dialogue shown below appears. At the bottom of
the dialogue select the
Enable inspection stage...
check box. This pauses
the measurement after the background measurement and allows a trial
spray before measurement starts so pre-measurement checks can be per-
formed. There’s no need to set up an output trigger so leave that check box
deselected.
.
Use the
Duration
box to specify how long the background measurement
will run for before moving to the next measurement stage.
Significant changes in the background may indicate spray deposition on the
optics during the measurement, reducing the accuracy of the results. To
check for these, select the
Warn if background changes during
measurement
check box. This makes two further options available:
Lower Detector Limit
and
Upper Detector Limit
– set the range of
detectors that should be monitored as part of the background check.
Change (%)
– sets the maximum allowable percentage change in the
average signal measured across the specified detector range which is
acceptable when carrying out the background check. If the background shift
between the beginning and end of the measurement is greater than this
percentage, a warning at the end of the measurement states that the optics
have possibly become contaminated by the spray.
.
The default set of alarms will suit most purposes; click the
Alarms
button
if required to review these. For full information on alarms, refer to Chapter
10. Click
Next
.
C H A P T E R 5
S
p
r
a
y
t
e
c
P a g e 5 . 9
Содержание Spraytec
Страница 1: ...Spraytec User Manual Spraytec User Manual M A N 0 3 6 8 I s s u e 1 0 N o v 2 0 0 5...
Страница 7: ...Part 1 Operator s guide Part 1 Operator s guide...
Страница 8: ......
Страница 9: ...Introduction to this manual Introduction to this manual C H A P T E R 1...
Страница 10: ......
Страница 16: ...C H A P T E R 1 S p r a y t e c Page 1 6 M A N 0 3 6 8...
Страница 17: ...What is the Spraytec What is the Spraytec C H A P T E R 2...
Страница 18: ......
Страница 31: ...The Spraytec hardware The Spraytec hardware C H A P T E R 3...
Страница 32: ......
Страница 42: ...C H A P T E R 3 S p r a y t e c Page 3 10 M A N 0 3 6 8...
Страница 43: ...The Spraytec software The Spraytec software C H A P T E R 4...
Страница 44: ......
Страница 63: ...Measurement tutorial Measurement tutorial C H A P T E R 5...
Страница 64: ......
Страница 99: ...Interpreting the results Interpreting the results C H A P T E R 6...
Страница 100: ......
Страница 125: ...Using measurement files Using measurement files C H A P T E R 7...
Страница 126: ......
Страница 133: ...Basic maintenance Basic maintenance C H A P T E R 8...
Страница 134: ......
Страница 139: ...Part 2 Supervisor s guide Part 2 Supervisor s guide...
Страница 140: ......
Страница 141: ...Security Security C H A P T E R 9...
Страница 142: ......
Страница 151: ...Advanced features Advanced features C H A P T E R 1 0...
Страница 152: ......
Страница 170: ...C H A P T E R 1 0 S p r a y t e c Page 10 18 M A N 0 3 6 8...
Страница 171: ...SOP management SOP management C H A P T E R 1 1...
Страница 172: ......
Страница 175: ...Part 3 Appendices Part 3 Appendices...
Страница 176: ......
Страница 177: ...Health and Safety Health and Safety A P P E N D I X A...
Страница 178: ......
Страница 184: ...A P P E N D I X A S p r a y t e c Page A 6 M A N 0 3 6 8...
Страница 185: ...Specification Specification A P P E N D I X B...
Страница 186: ......
Страница 191: ...Site requirements f r o m M A N 0 3 6 8 I s s u e 1 0 Site requirements A P P E N D I X C...
Страница 200: ...A P P E N D I X D S p r a y t e c Page D 3 M A N 0 3 6 8...
Страница 201: ...Installation Installation A P P E N D I X E...
Страница 202: ......
Страница 206: ...A P P E N D I X E S p r a y t e c Page E 4 M A N 0 3 6 8...
Страница 207: ...Regulatory statements Regulatory statements A P P E N D I X F...
Страница 208: ......
Страница 213: ...Index Index...
Страница 214: ......
Страница 221: ......