![Malmet Energy Saver ES930 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/malmet/energy-saver-es930/energy-saver-es930_operation-maintenance-and-installation-manual_698468031.webp)
Bedpan Washer Disinfector - Energy Saver
Detergent Model With Hands Free Operation
Operation, Maintenance and Installation Manual
Issue 21
Page 31
14 September 2017
Note: Bell Ends can be cut off to suit
Diagram C2
FOR REASONABLE CONNECTION WORKING SPACE ALLOW 150-200mm FROM REAR OF MACHINE TO
WALL
FREE STANDING
‘S’ TRAP PIPE POSITIONING
FREE STANDING
‘P’ TRAP PIPE POSITIONING
The centre of the soil line to receive the ‘S’ Trap
should be approximately 272mm from the back
wall. To allow for normal recommended
minimum service access, space soil line
600/700mm from side wall.
If space restrictions do not allow for
recommended side service access, Malmet
suggest preference be given to providing the
most space available on the right hand side as
you look at the front of the machine. This will
ease any difficulty in servicing the steam tank
element and probe.
The centre of the soil line to receive the ‘P’ Trap
should be approximately 410mm from the floor
when the unit is positioned 150mm from the
wall. Because this pipe is graded to 5° this
measurement will vary as the unit is installed
closer or further away from the back wall.
The Machine is 600mm wide and the centre of the trap is 300mm from each side.
Steam Venting
No external vent pipework is required as the machine is designed to condensate all visible steam within the
machine.