
83
07/06
SPIDER MAX 500 - EURO 3
E
F. 116
F. 117
• Detach the (upper) mount shaft (E).
• Remove the engine mount and the spacers.
While reassembling, take care not to interfere
and exchange the spacers, which will have to
be lubricated with bearing grease.
ANTI-VIBRATION CONNECTING RODS
• After removing the engine and its mount, release
the nut (F - F. 118).
• Remove the screw (V) and the washer (G).
• Remove the anti-vibration connecting rods (H).
V
65 ± 15%
ENGINE MOUNT
• Place the mount (A) inside the
frame.
• Fit the shaft (E).
• Fit the threaded bushing (C)
including the lock nut (D) to the
frame, taking care to observe
the prescribed torque.
• Fit the lock nut (D), tightening it
completely to the frame.
• Fit the self-locking nut (B),
tightening it to the prescribed
torque.
F. 118
E
V
E
H
V
G
H
F
D
C
B
X
Y
X
Y
C
10 ± 15%
B
35 ± 15%
If the bushing (C) was
tightened too much, it may
cause annoying vibrations
to the vehicle and
irreparable damages to the
bearing (U).
A
U
Содержание SPIDER MAX GT 500
Страница 1: ...1 07 06 SPIDER MAX 500 EURO 3 EURO 3 ...
Страница 52: ...52 07 06 SPIDER MAX 500 EURO 3 E F 32 DX SX ...
Страница 53: ...53 07 06 SPIDER MAX 500 EURO 3 E F 33 ...
Страница 57: ...57 07 06 SPIDER MAX 500 EURO 3 F 40 F 41 F 42 ...
Страница 61: ...61 07 06 SPIDER MAX 500 EURO 3 E F 55 F 54 ...
Страница 71: ...71 07 06 SPIDER MAX 500 EURO 3 E F 87 HOSE ROUTING left hand side cooling circuit ...
Страница 95: ...95 07 06 SPIDER MAX 500 EURO 3 F F 39 F 38 ...
Страница 96: ...96 07 06 SPIDER MAX 500 EURO 3 F F 41 F 40 ...
Страница 97: ...97 07 06 SPIDER MAX 500 EURO 3 F F 43 F 42 ...
Страница 98: ...98 07 06 SPIDER MAX 500 EURO 3 F F 44 ...
Страница 99: ...99 07 06 SPIDER MAX 500 EURO 3 F F 45 ...
Страница 100: ...100 07 06 SPIDER MAX 500 EURO 3 F F 46 ...
Страница 101: ...101 07 06 SPIDER MAX 500 EURO 3 F F 47 ...
Страница 102: ...102 07 06 SPIDER MAX 500 EURO 3 F F 48 ...
Страница 103: ...103 07 06 SPIDER MAX 500 EURO 3 F F 49 ...
Страница 104: ...104 07 06 SPIDER MAX 500 EURO 3 F F 50 ...