4.2 STARTING UP
First time operation of the boiler must be done by authorised service personel in order to
validate the guarantee of the boiler and to ensure the boiler runs efficiently and safely
for many years.
Authorized service personnel will check all requirements in the startup request form,
which must be filled by the installer before the service comes to validate the boiler for
first time operation.
If any of the requirements are not met, ther service will not put the boiler into operation
and will ask the user to complete installation requirements. The user then should contact
the installer and make sure that all the conditions of the starup request form are met.
When the installation meets all the requirements, the service personnel will put the boiler
into operation and manufacturer's warranty will be validated. The manufactuere is not
responsible for any failures or damages on boilers which are not validated by authorized
service.
The following steps will be taken to put the boiler into operation:
a) Check that the main circuit breaker and RCD device switches are on.
b) Check that the valves of the heating circuit and DHW installation are open.
c) Set the P2 key to the desired position from the OFF position and set the desired water
temperature by following the thermometer reading on the display.
d) You can set the DHW temperature using the P1 key. The adjusted temperature is
shown on the display.
The boiler will start operation automatically according to the adjustments made on the
control panel. Detailed explanation about making operation adjustments are given in
section 5, user instructions.
25
Содержание OMEGA
Страница 1: ...rev no 02 23 08 2019...
Страница 16: ...13...
Страница 31: ...28 5 3 TROUBLESHOOTING...
Страница 34: ...31 7 TECHNICAL TABLE...
Страница 36: ...10 EXPLODED VIEW 6 40kW MODELS 33 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 14 23 25 26 27 24...
Страница 38: ...10 2 HYDROLIC GROUP DETAIL 35 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 59 57 58 60 62 61 63 65 64...
Страница 39: ...10 3 RELAY BOARD GROUP DETAIL 36 66 67 68 69 70 71 72...
Страница 42: ...11 1 MAIN HEAT EXCHANGER GROUP DETAIL 39 31 32 34 33 35 36 37 42 43 44 46 38 39 40 41 45...
Страница 43: ...11 2 RELAY BOARD GROUP DETAIL 40 47 48 49 50 51 52 53 54...