3.MOUNTING AND INSTALLATION
3.1 UNPACKING
Open the box as seen in the above sketch. Place the box on the ground, arrows on the
box pointing to the ground. Cut the cords or remove the staples, fold the lids of the box
on each side and turn the box upside down. Pull the box upwards and remove it.
3.1.1 Delivery Content
3.2 INSTRUCTIONS FOR MOUNTING
Boiler should not be installed in humid places such as bathrooms and areas that may
be affected by rain water.
The boiler should be installed on strong walls that can carry it and perpendicular to the
ground.
Spesific space must be left around the for the authorized service to intervene in the
event of a technical breakdown or maintenance. You can find the minimum spaces
required for installation in the below diagram.
Only use the wall plugs, screws and wall mounting plate supplied with the device during
installation.The boiler must be installed vertically (upright position) and checked with a
spirit level so that it can work properly after installation. Failure to do so will invalidate
the warranty.
3.3 MINIMUM SPACES FOR INSTALLATION
At least the following space must be left in order to reach the internal parts of the
device easily when a failure occurs or when maintenance is carried out.
Suggested space is the minimum space and it is favorable to leave more space
depending on the situation.
7
1
RCD Device Box
2
4x30 Wood Screw
2
6 mm Wall Plug
6-40 kW
50-100 kW
1
RCD Device
1
Documents Pack
4
10x50 Wall Plug
4
M7x50 Screw
DESCRIPTION
1
Electrical Combi Boiler
1
Wall Mounting Plate
QTY
DESCRIPTION
1
Electrical Combi Boiler
QTY
4
M7x50 Screw
1
Wall Mounting Plate
1
Documents Pack
4
10x50 Wall Plug
Содержание OMEGA
Страница 1: ...rev no 02 23 08 2019...
Страница 16: ...13...
Страница 31: ...28 5 3 TROUBLESHOOTING...
Страница 34: ...31 7 TECHNICAL TABLE...
Страница 36: ...10 EXPLODED VIEW 6 40kW MODELS 33 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 14 23 25 26 27 24...
Страница 38: ...10 2 HYDROLIC GROUP DETAIL 35 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 59 57 58 60 62 61 63 65 64...
Страница 39: ...10 3 RELAY BOARD GROUP DETAIL 36 66 67 68 69 70 71 72...
Страница 42: ...11 1 MAIN HEAT EXCHANGER GROUP DETAIL 39 31 32 34 33 35 36 37 42 43 44 46 38 39 40 41 45...
Страница 43: ...11 2 RELAY BOARD GROUP DETAIL 40 47 48 49 50 51 52 53 54...