3.5 HEATING AND HOT WATER SYSTEM INSTALLATION CONNECTIONS
•
At DHW function, please make sure that the pressure of the city water network on
cold water inlet side is not more that 6 Bars. If the network pressure is more than 6
Bars, a pressure regulator must be added. In order for the DHW system to run, the
minimum pressure level of the network must be 0,8 Bar.
•
In order to provide a good circulation at heating function, installation pipe diameters
must be selected properly and diameter restrictions should not be allowed at elbow
passage. When selecting the pipe diameter, pipe resistance above the capacity of
the pump must be avoided. You can see the pump capacities from the pump
pressure curve.
•
When there is a pressure increase at heating system, the security ventile operates in
order to discharge water to decrease pressure.
•
When radiator thermostatic valves are installed in the heating system and when the
heat balance is provided at all isolated departments, if the thermostatic valves turns
off the system, automatic by-pass system immediately runs in order to provide the
minimum circulation in heat exchanger and provides the safety of device.
•
Insulation : We recommend that all pipe-work is insulated where practical. Especially
the primary pipe-work with in a boiler cupboard.This will reduce heat loss and protect
the cupboard from high temperatures.
CAUTION ! :
During installation ; on the return water inlet pipe , usage of 3/4" particule
filter and 2 valves on both sides of the filter is advised. On the cold water inlet pipe 1/2"
particule filter and valve must installed.
CAUTION ! :
The primary circuit must be flushed to ensure that no debris is traped in
the system. Failure to do so may lead to boiler failure which will not be covered by
manufacturer's warranty. Where existing radiators and pipe-work is used, a power flush
must be carried out to remove debris.
•
Central heating and domestic hot water pipe connections must be made according to
the below figure. Make sure to remove the plastic taps before making the pipe
connections. Inlets and outlets are clearly marked with blue and red colors on the
bottom of the boiler.
9
Содержание OMEGA
Страница 1: ...rev no 02 23 08 2019...
Страница 16: ...13...
Страница 31: ...28 5 3 TROUBLESHOOTING...
Страница 34: ...31 7 TECHNICAL TABLE...
Страница 36: ...10 EXPLODED VIEW 6 40kW MODELS 33 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 14 23 25 26 27 24...
Страница 38: ...10 2 HYDROLIC GROUP DETAIL 35 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 59 57 58 60 62 61 63 65 64...
Страница 39: ...10 3 RELAY BOARD GROUP DETAIL 36 66 67 68 69 70 71 72...
Страница 42: ...11 1 MAIN HEAT EXCHANGER GROUP DETAIL 39 31 32 34 33 35 36 37 42 43 44 46 38 39 40 41 45...
Страница 43: ...11 2 RELAY BOARD GROUP DETAIL 40 47 48 49 50 51 52 53 54...