EFFICIENT  USE OF BIOLERS IN TERMS OF ENERGY CONSUMPTION

Points to be considered about efficient energy use in houses, are stated below:

•There is %25-40 heat loss on the wall of buildings. The first precaution for energy

efficiency and low fuel consumption, must be enhancing the isolation. For this

purpose, outer walls of the building must be isolated from outside or inside.

•There is %20- 25 heat loss from the roofs.Soğuk çatılarda çatı arasına “TS 825

Binalarda Isı Yalıtım Kuralları” standartında belirtildiği şekilde ısı yalıtımı yapılmalıdır.

Heat isolation must be done in cold roofs lofts  up to TS 825 Binalarda Isı Yalıtım

Kuralları '' standarts.

•Air and moisture leakage of the doors and windows in house must be provided with

proper materials.

•Double- glazed windows and doors, making shutter and blinds will decimate the heat

loss.

•If there is air and moisture leakage connection points of door and window frames and

walls will be filled up with filling material  plaster,paste or silicone.

•Outer doors or other doors  belong to the unwarmed places (bathroom, corridor) must

be closed as far as possible.

•Most of the cold air flow becomes from under the door. Spaces under the doors can

be filled with an elastic material filling.

•Building doors shouldn't left open, double door or automatic closing systems must be

applied.

•It is recommended to clean the windows for receiving more sunlight, close the

curtains at nights, leave south, west, southwest and southeast position curtains open

that  are receiveing direct sunlight at winter time.

•Temperature shouldn't be increased more than adequate in winter time.

•When the temperature is too much, heater's regulation must be down instead of

opening windows.

•Moist air retain the heat well. In order to increase the felt temperature full of water pot

can be put on radiators. In this way place can be moisturised. %50-55 air moisturing

provides reducing vaporization and provides feeling temperature 2-3 ºC more.

•Marble etc. materials and covers shouldn't place on and laundry shouldn't make dried

on radiators.

•One side aluminium covered  thermal insulting boards shouldn't be placed behind the

radiators and between radiator and wall.

•In unused parts of the house, temperature adjustment must be in minimum level.

Also isolation of hot water pipes must be done in unheated parts of the house.

•Windows shouldn't stay open more than one hour in a day in winter time for cleaning

the air in internal volumes.

•It is recommended to make maintenance and control of heating systems which

includes burner settings based on flue gas mesaurement by Maktek autorised

services before every heating season.

•Heat isolation of pipes and tanks must be done if the boilers are in a place that no

need of heating.

•Using boiler automatically with room termostat prevents overheating by heating up to

adjusted temperature and provides fuel saving.

•Using termostatic valves on radiators provides energy saving by preventing

overheating of radiators. Termostatic valves can be adjusted to the intended degree

24

Содержание Epsilon LCD

Страница 1: ...TS EN ISO 9001 2015 BOILER Please Keep Please Read rev no 01 12 04 2019 USER S GUIDE...

Страница 2: ...EM FIRST OPERATING USAGE OF THE BOILER TECHNICAL SPECIFICATIONS ELECTRICITY CONNECTION SCHEMA HYDROLIC SCHEMA SAFETY SYSTEMS OF BOILER GAS PRESSURE SETTING MAINTENANCE GUARANTEE CONDITIONS IMPORTANT S...

Страница 3: ...d open wires Do not leave tools or staff on the device Injury resulted from falling objects from device becuse of vibration Harms on things or animals resulted from falling objects from device because...

Страница 4: ...re is lower boiler must be isolated within a proper keeping staff Only autorised service can intervene the all parts and sections that leakage is provided Disconnect the main energy connection shut do...

Страница 5: ...n maintenance chapter Only Maktek Autorised services can intervene the boiler EXPLANATIONS Boiler provides the heating by central boiler heating system and radiators connected to the sytem and provide...

Страница 6: ...APPERANCE AND EXTERNAL DIMENSIONS 4...

Страница 7: ...BURNING ROOM 8 BURNER 9 3 BAR SAFETY VENTILE 10 CIRCULATOR 11 FILLING VALVE 12 GAS VALVE 13 HOT WATER SYSTEM SENSOR 14 CHIMNEY OUT 15 FRESH AIR IN FLANGE 16 HERMETIC CABIN SIDE STEEL 17 BURNING ELECT...

Страница 8: ...ed temprature blinkes on the screen DHW function is OFF The boiler does not produce DHW TEST Mode of adjustment by AUTORISED SERVICE 2 P2 KEY OFF RESET The boiler is functionally switched off At failu...

Страница 9: ...ODE SOLUTION E04 page 20 E01 page 20 E02 page 20 E03 E37 E05 page 21 E06 E12 E035 EXPLANATION Low or high water pressure No Flame Limit termostat Chimney thermostat Pump Failure Heating system sensor...

Страница 10: ...roperly Please make the phase neutral and ground line connection as shown on the scheme IMPORTANT The boiler does not operate when the connection is done improperly The cable of the boiler must be con...

Страница 11: ...no air circulation Wall mounted boiler must be installed vertically on a firm wall The unit must not be installed in connection with dirty and oily flue where the kitchen appliances are connected to...

Страница 12: ...the capacity of the pump must be abstained by the use of pump on heating system pressure curve When there is a pressure increase at heating system the security ventile operates in order to discharge...

Страница 13: ...ing water into the boiler Chimney shouldn t touch with flammable material shouln t get throught flammable wall material Part of the chimney which stays inside the wall must be maximum 60 cm in behind...

Страница 14: ...the pugors other one can control the pressure by standing over the boiler and close the filling valve it is needed It is necessary to add water by opening filling valve in closed circuit system after...

Страница 15: ...the circulation pump in case of squeezing Turn on all the valves on boiler and installation pipes Closed circuit water pressure must ne 1 5 bar page 13 Choose the position of use with the help of P1 a...

Страница 16: ...mode boiler is shut down In OFF mode automatic protecting functions below are in use DHW Freezing Protection Central System Freezing Protection Pump Squeezing Protection 3 Way Valve Squeezing Protect...

Страница 17: ...set to intended value by turning P1 key Temperature increases in clockwise decreases in counter clock wise Adjusted temperature is blinked on screen while adjusting When it is at adjusted degree adjus...

Страница 18: ...TECNICAL SPECIFICATION TABLE 16...

Страница 19: ...ELECTRICITY CONNECTION SCHEMA 17...

Страница 20: ...heat sensor 5 Expansion tank 6 Burner 7 Three Way Valve Engine 8 Central heating circuit heat sensor 9 Hot water sensor 10 Pressure gauge 11 Gas valve 12 DHW exchanger 13 Filling valve 14 Circulation...

Страница 21: ...iler will work again If this failure occurs two times consequently please call an authorised service 4 ANTI CALCER SYSTEM This system provides an indirect control against calcer formation Whatever the...

Страница 22: ...can only done by an authorised service Diameter of the injectors must be suitable for fuel type used Natural Gas injector diameter 1 25mm LPG Propan Injector diameter 0 75mm Attention Be sure about th...

Страница 23: ...sage energy saving and protect quality at the beginning Maintenance must be done by only MAKTEK Autorised Service Intervention of private services except autorised services is extremely dangerous and...

Страница 24: ...s that belong the boilers which are damaged during transportation 6 Damages that occur as a result of bad dirty fuel use the use of over calcerous water in hot water system ideal water hardness must b...

Страница 25: ...e appropriate fire extinguisher must be used When Performing Maintainance or Repair When working on the heating system or the boiler itself there should be no current on these The main switch or fuse...

Страница 26: ...leave south west southwest and southeast position curtains open that are receiveing direct sunlight at winter time Temperature shouldn t be increased more than adequate in winter time When the tempera...

Страница 27: ...ler can be use with LPG Boilers that Natural gas LPG Modification was done by MAKTEK Autorised Services or produced suitable for LPG burning must be run with minimum 2 tubes by building suitable colle...

Страница 28: ...Seller 10013 Street No 14 A O S B i li IZMIR TURKEY Customer care sales maktek com tr Customer Hot Line 902323280365 www maktek com tr...

Отзывы: