CONTROL PANEL
All functions required to run the boiler, is done via two buttons on control panel.
These functions can be followed on LCD sreen. All failure reportings can be seen
on screen via specific codes.
1.P1 KEY
DHW Adjustment: Temprature of the DHW is adjusted from here.
Desired temprature blinkes on the screen.
DHW function is OFF. The boiler does not produce DHW.
TEST: Mode of adjustment by AUTORISED SERVICE.
2.P2 KEY
OFF -RESET:
The boiler is functionally switched off. At failure times, it is used as
reset. Security measures against frost and congestion is in effect.
Winter Mode:
Both DHW and heating function is on. Heating system
adjustments are made from here. Desired temprature flashes on the
screen.DHW is priority.
Summer Mode:
Only DHW function is on.
6
Содержание Epsilon LCD
Страница 1: ...TS EN ISO 9001 2015 BOILER Please Keep Please Read rev no 01 12 04 2019 USER S GUIDE...
Страница 6: ...APPERANCE AND EXTERNAL DIMENSIONS 4...
Страница 18: ...TECNICAL SPECIFICATION TABLE 16...
Страница 19: ...ELECTRICITY CONNECTION SCHEMA 17...