8. CLEANING AND MAINTAINENCE

 

 

Following instructions should be followed in order to keep boiler working safe and efficient for 
long time. 
Quality of the fuel used, would effect the boiler cleaning time, consumption amount of fuel     
and efficiency of boiler.  
 Small coal is burned in boiler. Do not burn dust and coke coal. Ash drawers should be cleansed 
up every day.  
High quality  high calorie and dry coal should be used in order to get high efficiency. 
Smoke pipes inner surface should be cleaned up with a brush and turbulators must be cleaned up 
with a tissue or cloth in every 15 days. Air inflow in burning pot air holes  must be checked. 
Holes which don't have air flow must be unclogged.  Air holes must be cleaned up by turning on 
the fan for 15 minutes. 
Electricity connection must be cut off before the maintainance.  Please ventilate the 
area before cleaning the boiler. 
Electricity, chimney, installation connections should be done before winter time.

 

 

 

 
 
9. SUGGESTIONS  FOR ECONOMIC USE

 

 

 

-In order to properly ventilate  the premises, please open the windows for short period 
of time   while the radiator valves are closed 
-  Pay attention not to heat up too much: room temprature must be kept at 20 degrees. 

Each degree makes a 6% economy on heating costs 

-     When the weather is dark, please close the shuttters if available 
-     Do not cover your radiators with objects 
-     Make use of special setting of the control panel, set the  using water from control panel 
-  Consume hot water considerably. You will consume less water and energy during 

shower in comparison to taking a long bath.

 

 
 

 
 
 

Содержание 25 MKK-S

Страница 1: ...1...

Страница 2: ...TION AND WATER FLOOD 9 BOILER INSTALLATION SCHEMA 10 4 2 AIR CONNECTION 11 4 3 CHIMNEY 11 CHIMNEY CONNECTION SCHEMA 12 5 TECHICAL FEATURES 13 6 CONTROL PANEL 14 7 FIRST OPEATION AND USE 15 7 1 FIRST B...

Страница 3: ...y and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and maintenan...

Страница 4: ...strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 degrees do not attempt to feed cold water to t...

Страница 5: ...g and waiting time on the electronic control panel Detoriations as a result of burning are minimised thanks to cast iron burning bunker Fan with quiet running cycle period and clap ensures maximum eff...

Страница 6: ...6 3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 5 6...

Страница 7: ...r must be connected to a good drawing chimney and minimum number of elbows should be used between chimney and boiler Boiler must be placed at a location with enough air intake for an efificient burnin...

Страница 8: ...om one end of the pipes and to drain off at the other side Circulation pump must be installed on boiler water return pipe During installation there must be enough working space left for technical serv...

Страница 9: ...n of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra se...

Страница 10: ...10 BOILER INSTALLATION SCHEMA...

Страница 11: ...ertical length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates...

Страница 12: ...the building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cem...

Страница 13: ...13 5 TECHNICAL SPECIFICATION...

Страница 14: ...r fuel loading 04 255 sec Fuel feeding period setting button Sets fuel loading period 04 60 sec Fan Setting Button Sets speed level of fan From 1 to 5 Thermostat Setting Button Adjust the intended tem...

Страница 15: ...iler lids must be closed and fan must be runned in low speed until the coal is completely combusted If fan blows too much air big slinders occurr because of the cooling effect of burning tank Make the...

Страница 16: ...ses 5 C below set degree Running and stopping of circulation pump and fan can be monitored from flashing leds on digital indicator on control panel Circulation pump will run automatically for 3 second...

Страница 17: ...nclogged Air holes must be cleaned up by turning on the fan for 15 minutes Electricity connection must be cut off before the maintainance Please ventilate the area before cleaning the boiler Electrici...

Страница 18: ...18 10 ELECTRICITY SCHEMA...

Страница 19: ...e comes from chimney connections Air holes which are inside the boiler can be blocked Clean up holes and smoke pipes regularly Boiler Chimney connections can be loosen Check the boiler chimney exit an...

Страница 20: ...use of the supporting ring When the boiler is lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VE...

Отзывы: