20
*1 Perform initial replacement after 20h operation.
*2 For the 200 operating hour inspection, request Authorized Service Agent or a machine shop.
*3 After emptying the fuel tank, continue to run the engine and drain fuel in the carburetor.
Operating time
Item
Before
operation
After
lubrication
Daily
(10h)
30h 50h 200h
Shutdown
/rest
Corres-po
nding P
Inspect/clean
٤
13
Engine oil
Replace
٤
*1
17
Tightening parts
(bolt, nut)
Inspect
٤
19
Clean/inspect
٤
̆
Fuel tank
Drain
fuel
٤
*3
20
Throttle lever
Check function
٤
15
Stop switch
Check function
٤
15
Cutting blade
Inspect
٤
٤
12
Low-speed rotation
Inspect/adjust
٤
16
Air cleaner
Clean
٤
18
Ignition plug
Inspect
٤
18
Cooling air duct
Clean/inspect
٤
19
Inspect
٤
19
Fuel pipe
Replace
٧
*2
̆
Gear-case grease
Refill
٤
19
Fuel
filter
Clean/replace
٤
19
Oil
tube
Inspect
٧
*2
Clearance between air intake
valve and air discharge valve
Adjust
٧
*2
̆
Engine
overhaul
٧
*2
̆
Carburetor
Drain
fuel
٤
*3
20
Содержание EBH340R
Страница 22: ...MEMO ...
Страница 23: ......
Страница 24: ...6119522700 08 02 Makita Corporation 3 11 8 Sumiyoshi cho Anjo Aichi 446 8502 Japan ...