background image

12. 

(A)

 To attach the 

chains

 on the front of the top beam, measure and mark 1.5in (4cm) from 

the bottom and 15in (38cm) toward the center, from the end of the top beam. Insert the small 

nail

 through 

loop

 in the last chain link on one chain, and hammer it into that spot. Repeat on the 

other side of the motor mounting brackets.

(B)

 From the nail, measure about 25.5in (65cm) toward the 

center of the top beam and loop the chain around your 

thumb,back toward the motor and above the nail. Drape 

the top of the chain over the motor sprocket so it locks in 

place. Repeat on the other side.

(C)

 On the right side, place the 

sprocket

 in the chain loop and attach the 

quick link

 through the 

hole in the sprocket, with its opening facing away from beam. Don’t tighten the link. On the left 

side, attach the spring and tighten the quick link, ensuring the link nut is facing away from the 

beam. 

(D)

 Carefully stretch out the spring from the left side to attach it to the other end to the open 

quick link on the right side. Tighten the right quick link to lock the chains together.

Attaching the chains

Drew’s Note: We recommend a friend help you connect 
the spring and each person wear safety goggles 
during stretching. The chain can snap back, causing 
damage to people, pets, and surroundings!

Chain Mounting 

Hardware Bag A

Spring Hardware Bag B

1.5in

15in

Drew’s Note: You can adjust the spring tension on your frame by moving the nails toward or away 
from center. The most important part is that the spring keeps the tension on the chains. We use nails 
to connect the chain to the frame, so if something goes awry, only the nails will be removed without 
damaging your frame.

Chain Mounting 

Hardware Bag A

25.5in

13

Содержание M2 CNC

Страница 1: ...v 1 5 Updated 8 30 21 Maker Made LLC The Standard Frame A guide to assembling the recommended 10ft top beam frame for our MakerMade M2 CNC Kit Set Up Guide for...

Страница 2: ...ching the motors 6 Attaching the stud mounts 7 Frame legs 8 Attaching the canvas frame 10 Leveling your frame 11 Optional skirts 12 Attaching the chains 13 Mounting the M2 to your frame 14 Arduino DUE...

Страница 3: ...font and look like this Drew s Note Let us know how this guide can be improved We love to hear from you Drew s notes are meant to answer some of the why questions you might have and give you tips to...

Страница 4: ...lso work Canvas Wasteboards 1 a second one is optional 1in x 6in x 8ft Bottom Skirt and optional top skirt see Part 6 2 optional 1in x 6in x 4ft Side Skirts Cut a 1in x 6in x 8ft in two if not availab...

Страница 5: ...gs with another canvas wasteboard D On the 37in line position another canvas wasteboard with the speed square and use a 2in x 4in board to support the top edge of the waste board while aligning and at...

Страница 6: ...ne short wood screw in the front and two in diagonal holes in the top C Place one X Y motor in each bracket with the black cylindrical ends toward the center Use the motor washers between the bracket...

Страница 7: ...to the top beam position a stud mount on the outside of each 51 5in line with the shorter angle of the stud mounts toward the top On one side push the bottom of the mount against the bottom of the top...

Страница 8: ...aw another perpendicular line intersecting the 70in and 76 75in lines Repeat on the other leg 7 Arrange the vertical frame legs parallel on the floor resting on their 2in edges Position the bottom bea...

Страница 9: ...horizontal frame legs write back on the ends of the 2in x 4in x 3ft boards Align the back end on the inside of the vertical frame legs at a 90 degree angle to make an L shape Use the speed square to e...

Страница 10: ...beam Attach to the canvases to the horizontal frame legs with two long wood screws on each side C Attach the top of the canvases to the bottom beam using three evenly spaced short wood screws on each...

Страница 11: ...is level This is especially useful in locations that don t have level floors Front Leveling your frame Drew s Note It s very important that your frame is square and level All of the M2 calibrations ar...

Страница 12: ...he side skirts measure and mark 1 5in 3 8cm in on each side of the canvases closest to the stud mounts Attach a 4ft side skirt to each side using 4 short wood screws Attaching the skirts Drew s Note A...

Страница 13: ...tighten the link On the left side attach the spring and tighten the quick link ensuring the link nut is facing away from the beam D Carefully stretch out the spring from the left side to attach it to...

Страница 14: ...chain thread through the opposite roller bearing carriage and attach with the other cotter pin into the second to last chain link Let go of the sled and it will rest against the canvas Drew s Note We...

Страница 15: ...ocontroller We recommend mounting the DUE to the wall behind your frame but it can be mounted in any safe location where it won t be stepped on or in conflict with the M2 during operation ARDUINO DUE...

Страница 16: ...r machine Use adequate dust collection or wear a respirator Breathing material dust can be harmful Use proper lifting techniques when loading unloading materials Always use caution when connecting rem...

Страница 17: ...Motor Mounting Brackets 2 Stud Mounts 4 Ring Carriage Roller Bearing Carriages 2 Z Axis Mount L Brackets 3 Z Axis Assembly Sled Router Clamp Roller Bearings 4 Chains 335cm 11ft 2 Dust Collection Brac...

Страница 18: ...nger silver wood screws X Y Motor Hardware Bag E Motor sprocket 2 Grub Screws 2 Motor screws 8 Motor washers 8 Bearing Carriage Hardware Bag F Shoulder bolt 4 Large washer 8 Large locking nut 4 Ring a...

Страница 19: ...wide 8ft 2 4m tall 8 5ft 2 6m long APPENDIX 3 OVERALL DIMENSIONS It s 6 5ft 1 98m from the floor to the top of the x y motors If the 8ft vertical frame legs are cut down optional 10ft 3 05m long at th...

Страница 20: ...s to maintain a 15 degree angle 3 The target distance of the motor offset from where the chain leaves the motor sprockets to the top of the wasteboard should be at least 18 for a 10ft top beam 24 for...

Отзывы: