
11
7.5. Capacitance Measurements
2. lnsert the black test lead banana plug into the negative
COM
jack and
the red test lead banana plug into the
V CAP TEMP Hz%
Ω
positive jack.
5. The display will indicate the proper decimal point and value.
WARNING:
To avoid electric shock, discharge the capacitor under
test before measuring.
1. Set the function switch to the
CAP
position.
3. Touch the test probe tips across the part under test. If "
OL
" appears
in the display, remove and discharge the component.
4. Read the capacitance value in the display.
Note:
For very large values of capacitance measurement it can take
several minutes before the final reading stabilizes.
3. Touch the test probe tips across the circuit or component under test.
4. Read the resistance on the LCD display.
7.4. Resistance
1. lnsert the black test lead into the negative COM terminal and the red
test lead into the
V CAP TEMP Hz%
positive terminal.
2. Set the function switch to the
Ω
position.
5. Connect the test leads in parallel to the circuit under test.
4. Press the PEAK key to tum on Peak test.
7.2. AC Voltage Measurement
1.lnsert the black test lead into the negative
COM
terminal and the red
test lead into the positive
V CAP·TEMP·Hz%
Ω
terminal.
3. Connect the test leads in parallel to the circuit under test.
2. Set the function switch to the
V~
position.
3. Press the MODE/FD key for 1 second to turn on the VFD test.
7.3. DC Voltage Measurement
1. lnsert the black test lead into the negative
COM
terminal and the red
test lead into the positive
V CAP·TEMP·Hz%
Ω
terminal.
2. Set the function switch to the
V~
position.
4. Read the voltage measurement on the LCD display.
6. Read the voltage measurement on the LCD display.
Содержание MT720
Страница 1: ...MT720 AC TRMS CLAMP METER INSTRUCTION MANUAL II...
Страница 2: ...2...